Back to bathroom remodel contractors
Kim Lee Constrtuction
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Aug 2006
- Last 24 months
- 0 permits filed
7 permits since 2000: 1 completed, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 never finaled. Typically 0 days from filing to permit and 384 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 9, 2004 | Never finaled issued Jan 2004, no final | 780 Potrero Av | bathroom replace ceramic tile bathtub, toilet, vanity and paintDetails
bathroom replace ceramic tile bathtub, toilet, vanity and paint | $10,000 |
| Oct 14, 2003 | Completed final sign-off Nov 2004 | 574 03rd St | #302-remove old sheetrock/plaster, install new sheetrock,replace new plumb/kitchen sink/bath sink/Details
#302-remove old sheetrock/plaster, install new sheetrock,replace new plumb/kitchen sink/bath sink/ | $16,000 |