Back to bathroom remodel contractors
Kenny J M Yu
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Jun 2026
- Last 24 months
- 10 permits filed
78 permits since 2000: 55 completed, 5 in progress, 9 never finaled, 9 expired or cancelled.
Of the 9 never-finaled permits, 7 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
18 bathroom remodel permits: 12 completed, 5 in progress, 1 never finaled. Typically 4 days from filing to permit and 151 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 4, 2026 | In progress issued Jun 2026 | 1040 Leavenworth St | #101: comply w/ nov #202651630: obtain permit for fire damage restoration. remodel kitchen, bathroom & bedroom. remove/replace w? 5/8 "type x" gyp bd. replace all window in-kind.Details
#101: comply w/ nov #202651630: obtain permit for fire damage restoration. remodel kitchen, bathroom & bedroom. remove/replace w? 5/8 "type x" gyp bd. replace all window in-kind. | $60,000 |
| Mar 9, 2026 | In progress issued May 2026 | 449 Plymouth Av | 1/f: convert existing office to second kitchenette and add bathroom per plan.Details
1/f: convert existing office to second kitchenette and add bathroom per plan. | $43,000 |
| Jan 26, 2026 | Completed final sign-off Jun 2026 | 1909 Oakdale Av | to comply with nov #200842994, mold midigation throughout. legalize 1 bedroom and 1 bathroom at 1st floor with total 550 sq ftDetails
to comply with nov #200842994, mold midigation throughout. legalize 1 bedroom and 1 bathroom at 1st floor with total 550 sq ft | $10,000 |
| Dec 24, 2025 | In progress issued Dec 2025 | 610 40th Av | kitchen and bathroom remodel, upgrade main panel to 200 amps, replace wires, replace drywall, tub to shower.Details
kitchen and bathroom remodel, upgrade main panel to 200 amps, replace wires, replace drywall, tub to shower. | $29,500 |
| Oct 3, 2024 | Completed final sign-off Feb 2025 | 1100 Cortland Av | rev 202408017774- reconfigure bathroom layout convert family room to bedroom at lower level. add laundry hookups per plan .Details
rev 202408017774- reconfigure bathroom layout convert family room to bedroom at lower level. add laundry hookups per plan . | $23,000 |
| Aug 1, 2024 | Completed final sign-off Feb 2025 | 1100 Cortland Av | remodel (1) kitchen & (1) bathroom. replace interior finishes w/ 5/8" type x gym bd. non structural.Details
remodel (1) kitchen & (1) bathroom. replace interior finishes w/ 5/8" type x gym bd. non structural. | $38,000 |
| Jul 17, 2024 | In progress issued Sep 2024 | 2000 Ortega St | 1) floor: 3 (n) bedrooms, 2 (n) bathrooms, office and bar. relocate laundry and mech. 2) floor: 2(n) bathrooms, remodel kitchen and dining room.Details
1) floor: 3 (n) bedrooms, 2 (n) bathrooms, office and bar. relocate laundry and mech. 2) floor: 2(n) bathrooms, remodel kitchen and dining room. | $250,000 |
| Apr 18, 2024 | In progress issued Oct 2024 | 210 Ashton Av | add 2 bedrooms, 2 baths, media room in existing garageDetails
add 2 bedrooms, 2 baths, media room in existing garage | $50,000 |
| Jan 12, 2022 | Completed final sign-off Nov 2022 | 960 Moscow St | legalization dwelling unit @ 1st fl per ordinance no. 43-14. (2 bedrooms, 1 bath & kitchen)Details
legalization dwelling unit @ 1st fl per ordinance no. 43-14. (2 bedrooms, 1 bath & kitchen) | $5,000 |
| Aug 8, 2019 | Completed final sign-off Oct 2019 | 1078 Capp St | partial comply with complaint # 201975531. unit 1: kitchen & bath remodel. unit 5: kitchen remdodel. replace cabinets, sink. remove & replace wall & finishes with 5/8" type "x" gyp bd at (e) location per fire damaged. approx 180 sq ft.Details
partial comply with complaint # 201975531. unit 1: kitchen & bath remodel. unit 5: kitchen remdodel. replace cabinets, sink. remove & replace wall & finishes with 5/8" type "x" gyp bd at (e) location per fire damaged. approx 180 sq ft. | $5,000 |
| Apr 12, 2017 | Completed final sign-off Apr 2018 | 138 Tara St | add 1 bedroom, family room, 2 full baths, storage room & side entry door at 1st floor per planDetails
add 1 bedroom, family room, 2 full baths, storage room & side entry door at 1st floor per plan | $39,600 |
| Jun 21, 2016 | Never finaled issued Jun 2016, no final | 1040 Leavenworth St | apt 2: replace bathrom tile and replace bathroom tile & replace hardwood floor at bedroom & family.Details
apt 2: replace bathrom tile and replace bathroom tile & replace hardwood floor at bedroom & family. | $5,000 |
| Feb 13, 2015 | Completed final sign-off Mar 2015 | 1040 Leavenworth St | #110: dry rot repair, comply with his complaint 201521981; bathroom remodel at unit #110- replace floor tile, damaged wood & window at existing location in kind.Details
#110: dry rot repair, comply with his complaint 201521981; bathroom remodel at unit #110- replace floor tile, damaged wood & window at existing location in kind. | $4,500 |
| Feb 10, 2015 | Completed final sign-off Feb 2016 | 1350 25th St | upgrade existing bathroom to ada accessible, add bathroom & break room per plan.Details
upgrade existing bathroom to ada accessible, add bathroom & break room per plan. | $43,000 |
| Nov 8, 2013 | Completed final sign-off Jul 2014 | 571 Darien Wy | legalized play room, 2 bathrooms, bedroom & laundry room at ground floorDetails
legalized play room, 2 bathrooms, bedroom & laundry room at ground floor | $38,300 |
| Feb 25, 2011 | Completed final sign-off Mar 2012 | 291 Parker Av | build an interior stair from 2nd floor to ground floor; build a master bedroom with bath & a family room with bath at ground floor. new living area to be sprinklered under separate permit.Details
build an interior stair from 2nd floor to ground floor; build a master bedroom with bath & a family room with bath at ground floor. new living area to be sprinklered under separate permit. | $30,000 |
| Jun 8, 2000 | Completed final sign-off Jan 2001 | 1534 21st Av | add 2 bedroom, 1 family room & 2 bath in basement.Details
add 2 bedroom, 1 family room & 2 bath in basement. | $18,000 |
| Mar 6, 2000 | Completed final sign-off Jul 2000 | 559 20th Av | correct n.o.v.19992775. remove bathroom & shower at ground floor . (n) wall for laundry at (e) strgeDetails
correct n.o.v.19992775. remove bathroom & shower at ground floor . (n) wall for laundry at (e) strge | $500 |