Back to bathroom remodel contractors
Kenneth Chou
- Based in
- San Francisco
- On San Francisco permits
- Oct 2015 to Oct 2016
- Last 24 months
- 0 permits filed
9 permits since 2000: 8 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 never finaled. Typically 10 days from filing to permit and 164 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 11, 2016 | Completed final sign-off Apr 2017 | 139 Ramsell St | remodel gr fl to have 2 bedrooms, 1 full bath, laundry. relocate gas f urnace and water ~encrypt&in garageDetails
remodel gr fl to have 2 bedrooms, 1 full bath, laundry. relocate gas f urnace and water ~encrypt&in garage | $34,000 |
| May 2, 2016 | Completed final sign-off Sep 2016 | 457 Somerset St | remodel ground floor to add family room and 1 full bathroom. convert (e) office & study room on ground floor to 2 bedrooms, 1 bedroom with (e) 1/2 bath. (e) office, study & 1/2 bath was permitted under 9804915.Details
remodel ground floor to add family room and 1 full bathroom. convert (e) office & study room on ground floor to 2 bedrooms, 1 bedroom with (e) 1/2 bath. (e) office, study & 1/2 bath was permitted under 9804915. | $19,000 |
| Apr 12, 2016 | Completed final sign-off Oct 2016 | 4220 18th St | relocate (e) bathroom, (e) closet and add furnace on attic floor.Details
relocate (e) bathroom, (e) closet and add furnace on attic floor. | $5,000 |
| Feb 5, 2016 | Completed final sign-off Jun 2016 | 4220 18th St | convert existing closet into half bath with vanity & shower on 3rd floor for unit 4220Details
convert existing closet into half bath with vanity & shower on 3rd floor for unit 4220 | $5,000 |
| Dec 17, 2015 | Never finaled issued Mar 2016, no final | 4222 18th St | add 2 bedrooms, 1 entertainment room, 1 full bath on attic per planDetails
add 2 bedrooms, 1 entertainment room, 1 full bath on attic per plan | $50,000 |
| Oct 19, 2015 | Completed final sign-off Mar 2016 | 35 Ramona Av | replace kitchen cabinets, countertop, sink, floor tiles, replace bathroom toilet, sink, shower tub, upgrading water pipe and electric wire.Details
replace kitchen cabinets, countertop, sink, floor tiles, replace bathroom toilet, sink, shower tub, upgrading water pipe and electric wire. | $20,000 |