Kenneth Chou
- Based in
- San Francisco
- On San Francisco permits
- Oct 2015 to Oct 2016
- Last 24 months
- 0 permits filed
9 permits since 2000: 8 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 7, 2016 | Completed final sign-off Nov 2016 | 1576 18th Av | fix the outside damaged wood on the right south side of the wall to match extg wood and paint. no other exterior change proposed.Details
fix the outside damaged wood on the right south side of the wall to match extg wood and paint. no other exterior change proposed. | $3,500 |
| Jul 11, 2016 | Completed final sign-off Apr 2017 | 139 Ramsell St | remodel gr fl to have 2 bedrooms, 1 full bath, laundry. relocate gas f urnace and water ~encrypt&in garageDetails
remodel gr fl to have 2 bedrooms, 1 full bath, laundry. relocate gas f urnace and water ~encrypt&in garage | $34,000 |
| May 11, 2016 | Completed final sign-off Sep 2016 | 738 Arguello Bl | 2/f: remodel (e) kitchen with new cabinets, counter top & fixtures. no structural work.Details
2/f: remodel (e) kitchen with new cabinets, counter top & fixtures. no structural work. | $12,000 |
| May 2, 2016 | Completed final sign-off Sep 2016 | 457 Somerset St | remodel ground floor to add family room and 1 full bathroom. convert (e) office & study room on ground floor to 2 bedrooms, 1 bedroom with (e) 1/2 bath. (e) office, study & 1/2 bath was permitted under 9804915.Details
remodel ground floor to add family room and 1 full bathroom. convert (e) office & study room on ground floor to 2 bedrooms, 1 bedroom with (e) 1/2 bath. (e) office, study & 1/2 bath was permitted under 9804915. | $19,000 |
| Apr 12, 2016 | Completed final sign-off Oct 2016 | 4220 18th St | relocate (e) bathroom, (e) closet and add furnace on attic floor.Details
relocate (e) bathroom, (e) closet and add furnace on attic floor. | $5,000 |
| Feb 5, 2016 | Completed final sign-off Jun 2016 | 4220 18th St | convert existing closet into half bath with vanity & shower on 3rd floor for unit 4220Details
convert existing closet into half bath with vanity & shower on 3rd floor for unit 4220 | $5,000 |
| Dec 17, 2015 | Never finaled issued Mar 2016, no final | 4222 18th St | add 2 bedrooms, 1 entertainment room, 1 full bath on attic per planDetails
add 2 bedrooms, 1 entertainment room, 1 full bath on attic per plan | $50,000 |
| Dec 11, 2015 | Completed final sign-off Jun 2016 | 4220 18th St | replace current kitchen cabinetss and sink. replace windows of deck in the back.Details
replace current kitchen cabinetss and sink. replace windows of deck in the back. | $11,250 |
| Oct 19, 2015 | Completed final sign-off Mar 2016 | 35 Ramona Av | replace kitchen cabinets, countertop, sink, floor tiles, replace bathroom toilet, sink, shower tub, upgrading water pipe and electric wire.Details
replace kitchen cabinets, countertop, sink, floor tiles, replace bathroom toilet, sink, shower tub, upgrading water pipe and electric wire. | $20,000 |