Kenneally Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Mar 2026
- Last 24 months
- 2 permits filed
48 permits since 2000: 36 completed, 2 in progress, 9 never finaled, 1 expired or cancelled.
Of the 9 never-finaled permits, 3 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
6 deck permits: 4 completed, 2 in progress. Typically 29 days from filing to permit and 143 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 24, 2026 | In progress issued Apr 2026 | 67 Blake St | revision to permit # 202508122793: expanding horizontal addition. revised deck to steel design. new laundry level 1, new storage closet level 2, + new luandry level 3.Details
revision to permit # 202508122793: expanding horizontal addition. revised deck to steel design. new laundry level 1, new storage closet level 2, + new luandry level 3. | $62,208 |
| Aug 12, 2025 | In progress issued Sep 2025 | 67 Blake St | two units: level 1 177 sf addition, new bedroom, bath, storage, lower foundation, new windows & doors. level 2: 32 sf addition, interior remodel, new rear deck in-kind, new windows & doors, new stair to level 1, replace front stair in-kind. level 3:32 sf addition, inter remodel, new rear yard deck,Details
two units: level 1 177 sf addition, new bedroom, bath, storage, lower foundation, new windows & doors. level 2: 32 sf addition, interior remodel, new rear deck in-kind, new windows & doors, new stair to level 1, replace front stair in-kind. level 3:32 sf addition, inter remodel, new rear yard deck, | $257,800 |
| Aug 14, 2020 | Completed final sign-off Apr 2021 | 228 Athens St | complete interior remodel of 1st & 2nd floor. replace rear deck and stair.Details
complete interior remodel of 1st & 2nd floor. replace rear deck and stair. | $200,000 |
| Mar 12, 2013 | Completed final sign-off Jan 2014 | 2220 Castro St | revision to pa# 2006 0412 8740 & pa# 2013 0318 2456. enlarge patio at rear yard; reconfigured floor plans at 1st, 2nd & 3rd floor; reconfigure windows & ext doors; remove fire escape decks & ladders at rear elevation ;change guardrail at front deck to sold rail.full deck to solid rail full houseDetails
revision to pa# 2006 0412 8740 & pa# 2013 0318 2456. enlarge patio at rear yard; reconfigured floor plans at 1st, 2nd & 3rd floor; reconfigure windows & ext doors; remove fire escape decks & ladders at rear elevation ;change guardrail at front deck to sold rail.full deck to solid rail full house | $30,000 |
| Dec 21, 2010 | Completed final sign-off Mar 2011 | 25 Coso Av | legalize existing deckDetails
legalize existing deck | $18,300 |
| Oct 18, 2005 | Completed final sign-off Apr 2006 | 536 Laidley St | temporary shoring for damage repair ~ 12 lf @ front of house. temp shoring to support (e) conc. deck only.Details
temporary shoring for damage repair ~ 12 lf @ front of house. temp shoring to support (e) conc. deck only. | $500 |