Back to bathroom remodel contractors
Kenneally Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Mar 2026
- Last 24 months
- 2 permits filed
48 permits since 2000: 36 completed, 2 in progress, 9 never finaled, 1 expired or cancelled.
Of the 9 never-finaled permits, 3 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 in progress. Typically 506 days from filing to permit and 768 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 12, 2025 | In progress issued Sep 2025 | 67 Blake St | two units: level 1 177 sf addition, new bedroom, bath, storage, lower foundation, new windows & doors. level 2: 32 sf addition, interior remodel, new rear deck in-kind, new windows & doors, new stair to level 1, replace front stair in-kind. level 3:32 sf addition, inter remodel, new rear yard deck,Details
two units: level 1 177 sf addition, new bedroom, bath, storage, lower foundation, new windows & doors. level 2: 32 sf addition, interior remodel, new rear deck in-kind, new windows & doors, new stair to level 1, replace front stair in-kind. level 3:32 sf addition, inter remodel, new rear yard deck, | $257,800 |
| Feb 16, 2023 | Completed final sign-off Jul 2025 | 2590 Green St | new elevator for accessibility/ mobility w/ related dormer & reconfigure bathroom on 2nd flr and powder room on 3rd flr to accommodate elevator, replace 2 north facing windows.Details
new elevator for accessibility/ mobility w/ related dormer & reconfigure bathroom on 2nd flr and powder room on 3rd flr to accommodate elevator, replace 2 north facing windows. | $650,000 |
| Oct 15, 2020 | Completed final sign-off Apr 2026 | 10 05th Av | replace (e) foundation, excavate partial building footprint for (n) mat slab. interior remodel basement and 1st floor. new mud room, bedroom, living room with wet bar and full bath at bsmt level. partial window replacement, side and rear.Details
replace (e) foundation, excavate partial building footprint for (n) mat slab. interior remodel basement and 1st floor. new mud room, bedroom, living room with wet bar and full bath at bsmt level. partial window replacement, side and rear. | $1,000,000 |
| Sep 11, 2014 | Completed final sign-off Oct 2017 | 2860 Greenwich St | front facade alt, 1 story 9'-0" vertical addition, horizontal addition to the west and north side and structural and interior remodel associated with it. add: 1 bedroom and 1 bath for #2860 the upper unit) add 1 bedroom and 2 baths plus common area 1/2 bath for #2862 the lower unit)Details
front facade alt, 1 story 9'-0" vertical addition, horizontal addition to the west and north side and structural and interior remodel associated with it. add: 1 bedroom and 1 bath for #2860 the upper unit) add 1 bedroom and 2 baths plus common area 1/2 bath for #2862 the lower unit) | $950,000 |
| May 9, 2014 | Completed final sign-off Feb 2018 | 556 28th St | additions & renovations incl: rear yard horizontal addition, vertical addition of a 3rd flr level(add 3 bedrms 3 baths); conversion of garage to a garage & add 1 bedrm 1 bath & fam rm) interior remodel throughout.add powder room @ 2nd levelDetails
additions & renovations incl: rear yard horizontal addition, vertical addition of a 3rd flr level(add 3 bedrms 3 baths); conversion of garage to a garage & add 1 bedrm 1 bath & fam rm) interior remodel throughout.add powder room @ 2nd level | $700,000 |
| Apr 22, 2014 | Completed final sign-off Jul 2019 | 17 Temple St | vertical & horizontal addition. remodel 2 story, 2 bedroom, 1 bath, single family residence to a 3 story duplex.Details
vertical & horizontal addition. remodel 2 story, 2 bedroom, 1 bath, single family residence to a 3 story duplex. | $500,000 |