Back to kitchen remodel contractors
Kenley Wei Liang
- Based in
- San Francisco
- On San Francisco permits
- Aug 2001 to Nov 2018
- Last 24 months
- 0 permits filed
10 permits since 2000: 8 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 0 days from filing to permit and 155 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 7, 2018 | Completed final sign-off Mar 2019 | 980 Cayuga Av | relocate (e) kitchen, convert (e) kitchen space to office. all work on 2nd floorDetails
relocate (e) kitchen, convert (e) kitchen space to office. all work on 2nd floor | $18,000 |
| Mar 22, 2013 | Completed final sign-off Jun 2013 | 1366 12th Av | remodel kitchen, replace kitchen cabinets. remodel 2 bathrooms, replace bathtub, toilet & vanity.Details
remodel kitchen, replace kitchen cabinets. remodel 2 bathrooms, replace bathtub, toilet & vanity. | $38,000 |
| Jan 10, 2011 | Completed final sign-off Jul 2011 | 1706 17th Av | kitchen remodeling, change counter top and cabinet: (remodel (e) kitchen, replace with new counter top and new cabinets).Details
kitchen remodeling, change counter top and cabinet: (remodel (e) kitchen, replace with new counter top and new cabinets). | $5,200 |
| Dec 24, 2010 | Completed final sign-off Jul 2011 | 20 Terrace Dr | kitchen remodel, cabinets, countertop, backsplash. bathroom remodel, tile, replace sink & shower/bath.Details
kitchen remodel, cabinets, countertop, backsplash. bathroom remodel, tile, replace sink & shower/bath. | $36,336 |