Back to kitchen remodel contractors
Kenji Hasegawa
- Based in
- Oakland
- On San Francisco permits
- Sep 2004 to Sep 2019
- Last 24 months
- 0 permits filed
10 permits since 2000: 9 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 never finaled. Typically 0 days from filing to permit and 163 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 27, 2018 | Completed final sign-off Apr 2019 | 1510 07th Av | install new cabinet, new flooring & tiles, electrical work in kitchen.Details
install new cabinet, new flooring & tiles, electrical work in kitchen. | $17,000 |
| Sep 13, 2017 | Never finaled issued Sep 2017, no final | 610 Holloway Av | rewire, adding sub panel & main panel w/mast conduit & wether head, remodel lower level bathroom & lights, remodel upper level bathroom , kitchen & lights fix balcony above garage roofDetails
rewire, adding sub panel & main panel w/mast conduit & wether head, remodel lower level bathroom & lights, remodel upper level bathroom , kitchen & lights fix balcony above garage roof | $140,000 |
| Nov 23, 2016 | Completed final sign-off Apr 2017 | 88 Peralta Av | remodel existing kitchen. replace cabinets & countertops. new stovetop, minor electrical & new sink/faucet set. no walls moved, removed, added or infilled. all existing layouts to remain unchanged.Details
remodel existing kitchen. replace cabinets & countertops. new stovetop, minor electrical & new sink/faucet set. no walls moved, removed, added or infilled. all existing layouts to remain unchanged. | $11,000 |