Back to kitchen remodel contractors
Kelun Construction
- Based in
- Sunnyvale
- On San Francisco permits
- Aug 2020 to Jun 2026
- Last 24 months
- 20 permits filed
46 permits since 2000: 31 completed, 6 in progress, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 6 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 11 completed, 2 in progress, 2 never finaled, 1 expired or cancelled. Typically 5 days from filing to permit and 157 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 31, 2026 | Completed final sign-off Aug 2026 | 66 Cleary Ct | unit 1104: kitchen remodel like to like; (2) bathroom remodeling like to likeDetails
unit 1104: kitchen remodel like to like; (2) bathroom remodeling like to like | $40,000 |
| Nov 12, 2025 | Completed final sign-off Apr 2026 | 548 Burrows St | remodel (e) kitchen, convert 1 (e) bathroom to 2 full bathroom. all work at 2/f.Details
remodel (e) kitchen, convert 1 (e) bathroom to 2 full bathroom. all work at 2/f. | $96,500 |
| Jun 13, 2025 | Completed final sign-off Sep 2025 | 302 Sanchez St | kitchen line to line remodeling. 3 windows replacing. no structure change. (not visible from street).Details
kitchen line to line remodeling. 3 windows replacing. no structure change. (not visible from street). | $8,000 |
| Jun 11, 2025 | Completed final sign-off Mar 2026 | 57 Cayuga Av | remodel (e) kitchen, remove (e) storage and add new bathroom on 2nd fl, add (3) skylightsDetails
remodel (e) kitchen, remove (e) storage and add new bathroom on 2nd fl, add (3) skylights | $75,000 |
| Apr 17, 2025 | Completed final sign-off Sep 2026 | 975 Darien Wy | add (n) rear deck, 2 bedrooms, bathroom & laundry room on 1/f. relocate interior staircase & kitchen on 2/f. add (n) master bathrooms & closets on 2/f.Details
add (n) rear deck, 2 bedrooms, bathroom & laundry room on 1/f. relocate interior staircase & kitchen on 2/f. add (n) master bathrooms & closets on 2/f. | $200,000 |
| Sep 13, 2024 | In progress issued Sep 2024 | 631 33rd Av | remodel 2nd floor: kitchen and bathroom in kind. remodel 3rd floor: kitchen and bathroom in kind.Details
remodel 2nd floor: kitchen and bathroom in kind. remodel 3rd floor: kitchen and bathroom in kind. | $6,000 |
| Aug 12, 2024 | In progress issued Aug 2024 | 1647 38th Av | revision to pa # 2023-0609-9718 and 202310058087 1st fl: reconfigure laundry & kitchenette layout 2nd fl: repair/replace fire damaged wall in south east corner. replace ceiling joists at bedrooms.Details
revision to pa # 2023-0609-9718 and 202310058087 1st fl: reconfigure laundry & kitchenette layout 2nd fl: repair/replace fire damaged wall in south east corner. replace ceiling joists at bedrooms. | $5,000 |
| Aug 1, 2024 | Completed final sign-off Jan 2025 | 1885 Bay Shore Bl | 2/f - unit 2: to comply with nov 200670974. to remove non-permit rear deck and patio doors. reinstall 2 windows and patch wll to match existing. reinstall wall finishes at bathroom, kitchen, living, hall, bedroom and appliances in kitchen.Details
2/f - unit 2: to comply with nov 200670974. to remove non-permit rear deck and patio doors. reinstall 2 windows and patch wll to match existing. reinstall wall finishes at bathroom, kitchen, living, hall, bedroom and appliances in kitchen. | $12,000 |
| May 17, 2024 | Completed final sign-off Aug 2024 | 438 24th Av | unit#4: (1) kitchen like for like remodeling: (2) bathroom replace tile and vanity with faucet.Details
unit#4: (1) kitchen like for like remodeling: (2) bathroom replace tile and vanity with faucet. | $30,000 |
| Oct 5, 2023 | Never finaled issued Oct 2023, no final | 1647 38th Av | revision to permit 202306099718. 2/f: reconfigure bathrooms and interior stairs. add (2) skylights. 1/f: remodel bathroom, reconfigure laundry and hallway. add kitchenette.Details
revision to permit 202306099718. 2/f: reconfigure bathrooms and interior stairs. add (2) skylights. 1/f: remodel bathroom, reconfigure laundry and hallway. add kitchenette. | $54,000 |
| Sep 5, 2023 | Completed final sign-off Jul 2025 | 555 Fulton St | 5/f unit 518: relocate the kitchen, bedroom, and lavatory. install a new supply register for the new bedroom. perform new plumbing work for the new kitchen and new bath lavatory. no exterior work. revision to permits 201305036062 and 202204202596Details
5/f unit 518: relocate the kitchen, bedroom, and lavatory. install a new supply register for the new bedroom. perform new plumbing work for the new kitchen and new bath lavatory. no exterior work. revision to permits 201305036062 and 202204202596 | $90,000 |
| Oct 27, 2022 | Completed final sign-off Feb 2023 | 1915 30th Av | 1st floor 1 bathroom: change wall tiles, vanity, and pocket door to be replaced same size same location. (6) door replacement same size same location(interior and exterior (not street visible). 2nd floor 1 bathroom and 1 kitchen remodeling. fence replacement install- backyard and no more than 6 ft.Details
1st floor 1 bathroom: change wall tiles, vanity, and pocket door to be replaced same size same location. (6) door replacement same size same location(interior and exterior (not street visible). 2nd floor 1 bathroom and 1 kitchen remodeling. fence replacement install- backyard and no more than 6 ft. | $35,000 |
| Jun 13, 2022 | Completed final sign-off Jul 2024 | 355 01st St | interior remodel of condominium unit in a high rise. replace bathroom and kitchen finsihes, fixtures and case works; add one interior partition wall; add soffit and tray ceiling for lighting fixtures, convert part of the living space into one bedroom. no modification to sprinklers.Details
interior remodel of condominium unit in a high rise. replace bathroom and kitchen finsihes, fixtures and case works; add one interior partition wall; add soffit and tray ceiling for lighting fixtures, convert part of the living space into one bedroom. no modification to sprinklers. | $90,000 |
| Mar 23, 2022 | Completed final sign-off May 2023 | 2971 23rd Av | 1st fl: (n) door at home office. 2nd fl: remodel (e) kitchen & bathroom. (n) skylight & guardrail. 3rd fl: relocate bathroom window. (n) french door at closet. replace light fixture & outlet for entire bldg.Details
1st fl: (n) door at home office. 2nd fl: remodel (e) kitchen & bathroom. (n) skylight & guardrail. 3rd fl: relocate bathroom window. (n) french door at closet. replace light fixture & outlet for entire bldg. | $45,000 |
| Feb 22, 2022 | Never finaled issued Feb 2022, no final | 1107 Visitacion Av | kitchen and bathroom renovation. replace cabinets, plumbing, electrical. replace tiles, toilet, sink, shower. no walls or layout changes.Details
kitchen and bathroom renovation. replace cabinets, plumbing, electrical. replace tiles, toilet, sink, shower. no walls or layout changes. | $20,000 |
| Nov 12, 2021 | Expired or cancelled expired Apr 2026 | 2486 41st Av | interior remodel at the 2nd floor extg kitchen and remove a wall between extg living room and kitchen. replace extg bathtub with shower base in bathroom. add ceiling lights in extg bedrooms at the 2nd floor.Details
interior remodel at the 2nd floor extg kitchen and remove a wall between extg living room and kitchen. replace extg bathtub with shower base in bathroom. add ceiling lights in extg bedrooms at the 2nd floor. | $40,000 |