Back to kitchen remodel contractors
Ke Construction Co.
- Based in
- Daly City
- On San Francisco permits
- May 2007 to Aug 2026
- Last 24 months
- 6 permits filed
35 permits since 2000: 19 completed, 8 in progress, 8 never finaled.
Of the 8 never-finaled permits, 4 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 9 completed, 2 in progress. Typically 0 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 7, 2022 | In progress issued Jan 2025 | 1438 Van Dyke Av | comply with nov# 202173601 and 202174331. revision to pa# 202001212313. new adu per california government code section 65852.2 at 1st fl. modify (e) floor space to adu included bedroom, bathroom, family and kitchen.Details
comply with nov# 202173601 and 202174331. revision to pa# 202001212313. new adu per california government code section 65852.2 at 1st fl. modify (e) floor space to adu included bedroom, bathroom, family and kitchen. | $35,000 |
| Dec 16, 2019 | In progress issued Jan 2025 | 1438 Van Dyke Av | legalize (e) dwelling unit @ 1st floor per ordinance# 43-14. new unit included 2 bedrooms, 2 baths & kitchen. ** maher: n/a **Details
legalize (e) dwelling unit @ 1st floor per ordinance# 43-14. new unit included 2 bedrooms, 2 baths & kitchen. ** maher: n/a ** | $50,000 |
| Aug 28, 2014 | Completed final sign-off Jul 2015 | 716 Clementina St | remodel extg units: #716,716a,718, & 718a. relocate and remodel extg kitchen and bathroom, remodel extg bedrooms and living room. new water and furnace for each units, new outlet and fixtures(light) all work per plans.n/a for the maher ordinance #155-13Details
remodel extg units: #716,716a,718, & 718a. relocate and remodel extg kitchen and bathroom, remodel extg bedrooms and living room. new water and furnace for each units, new outlet and fixtures(light) all work per plans.n/a for the maher ordinance #155-13 | $9,900 |
| May 4, 2012 | Completed final sign-off Jul 2012 | 2136 Alemany Bl | relocated (e) kitchen & change the (e) kitchen to home office on 2nd floor. remodel (e) bathroom on 2nd floorDetails
relocated (e) kitchen & change the (e) kitchen to home office on 2nd floor. remodel (e) bathroom on 2nd floor | $29,000 |
| Oct 7, 2008 | Completed final sign-off Nov 2008 | 1998 Pacific Av | work @ apt# 106 only. remodel kitchen. remove (e) cabinets & counter top. replace new cabinets & counter top & new engineering hardwood floor in kitchen area. (all appliances in same location).Details
work @ apt# 106 only. remodel kitchen. remove (e) cabinets & counter top. replace new cabinets & counter top & new engineering hardwood floor in kitchen area. (all appliances in same location). | $6,000 |
| Aug 15, 2008 | Completed final sign-off Jan 2009 | 123 Lee Av | repair/replace sheetrock in living room about 30%, remodel kitchen & bathroom, half bath at 2nd fl, provide insulation where work.Details
repair/replace sheetrock in living room about 30%, remodel kitchen & bathroom, half bath at 2nd fl, provide insulation where work. | $42,000 |
| Nov 5, 2007 | Completed final sign-off Apr 2008 | 1859 17th Av | remodel (e) 2nd floor. 2 bathroom & 1 kitchen & new sheetrock. 2nd floor.Details
remodel (e) 2nd floor. 2 bathroom & 1 kitchen & new sheetrock. 2nd floor. | $35,000 |
| Oct 16, 2007 | Completed final sign-off Mar 2008 | 644 Morse St | remodel 1 kitchen and 1 bathroom on 2nd floor and replace 7 windows through outhouse, some windows @ front.Details
remodel 1 kitchen and 1 bathroom on 2nd floor and replace 7 windows through outhouse, some windows @ front. | $20,000 |
| Aug 8, 2007 | Completed final sign-off Nov 2007 | 1866 38th Av | remodel kitchen.Details
remodel kitchen. | $6,000 |
| Jun 22, 2007 | Completed final sign-off Feb 2008 | 833 26th Av | add bedroom, family room, full bath and powder room at ground floor. remodel kitchen bath, rooms at 2nd floor and add 1 new bath.Details
add bedroom, family room, full bath and powder room at ground floor. remodel kitchen bath, rooms at 2nd floor and add 1 new bath. | $75,000 |
| Jun 5, 2007 | Completed final sign-off Aug 2007 | 1530 Dolores St | work @ unit# 5 only. change kitchen counter top & cabinet. install new tile floor, install disposal & dish washer. change 10 window on rear side of the building. alluminium to vinyl (unit# 5) no structural. 0.67 u factor min. new lighting fixtures. min 50% of kitchen light wattage must beDetails
work @ unit# 5 only. change kitchen counter top & cabinet. install new tile floor, install disposal & dish washer. change 10 window on rear side of the building. alluminium to vinyl (unit# 5) no structural. 0.67 u factor min. new lighting fixtures. min 50% of kitchen light wattage must be | $15,000 |