Back to kitchen remodel contractors
Kc Renovation Experts Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2014 to Jun 2017
- Last 24 months
- 0 permits filed
10 permits since 2000: 8 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 3 completed, 2 never finaled. Typically 0 days from filing to permit and 139 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 16, 2016 | Completed final sign-off Sep 2016 | 685 Dwight St | remodeling (2) bathrooms, (1) kitchen, change windows, change tub, vanity sink, toilet, cabinets & dishwasherDetails
remodeling (2) bathrooms, (1) kitchen, change windows, change tub, vanity sink, toilet, cabinets & dishwasher | $20,000 |
| Oct 22, 2015 | Never finaled issued Oct 2015, no final | 367 Pope St | replace bathroom floor tile and wall tile, replace kitchen floor and countertop. (e) cabinets and fixtures to remain.Details
replace bathroom floor tile and wall tile, replace kitchen floor and countertop. (e) cabinets and fixtures to remain. | $24,000 |
| Apr 23, 2015 | Never finaled issued May 2015, no final | 1443 46th Av | at 2nd floor, remodel/relocate (e) kitchen and bathroom. remove bearing wall and install new beams - replace 2 front windows with aluminum clad wood windows.Details
at 2nd floor, remodel/relocate (e) kitchen and bathroom. remove bearing wall and install new beams - replace 2 front windows with aluminum clad wood windows. | $30,000 |
| Sep 5, 2014 | Completed final sign-off Dec 2014 | 1727 11th Av | revision & addition to pa #2014.0730.2559 - replace kitchen cabinet, sik & electrical outlets & light fixtures. replace bathroom shower pan, vanity sink & light fixture. no change on walls.Details
revision & addition to pa #2014.0730.2559 - replace kitchen cabinet, sik & electrical outlets & light fixtures. replace bathroom shower pan, vanity sink & light fixture. no change on walls. | $9,000 |
| Jul 30, 2014 | Completed final sign-off Dec 2014 | 1727 11th Av | replace kitchen counter top & tile flooring, replace bathroom tile flooring & surrounding tilesDetails
replace kitchen counter top & tile flooring, replace bathroom tile flooring & surrounding tiles | $9,000 |