Back to bathroom remodel contractors
Kat Construction
- Based in
- South San Francisco
- On San Francisco permits
- Aug 2012 to Apr 2021
- Last 24 months
- 0 permits filed
13 permits since 2000: 8 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 164 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 29, 2018 | Completed final sign-off Apr 2019 | 646 47th Av | revision to (e) 201809119672 add new bathroom to (e) walk in closetDetails
revision to (e) 201809119672 add new bathroom to (e) walk in closet | $10,000 |
| Jul 23, 2018 | Expired or cancelled expired Oct 2019 | 350 University St | remodel of existing bathrooms on first and 2nd floors. install new shower valves, sinks, toilets, shower pans, tiles, led electrical lighting with sesonr switch. install aDetails
remodel of existing bathrooms on first and 2nd floors. install new shower valves, sinks, toilets, shower pans, tiles, led electrical lighting with sesonr switch. install a | $80,000 |
| Apr 30, 2013 | Completed final sign-off Sep 2014 | 49 Lucy St | unit 49 only - remodel 1st floor - convert stor space into bedroom, family, playroom & full bath. replace windows with aluminum clad wood windows. enlarge window opening, add new plywood to (e) wall, add new holddown anchor to (e) concrete. fire sprinker on unit 49 will be deffered submittal.Details
unit 49 only - remodel 1st floor - convert stor space into bedroom, family, playroom & full bath. replace windows with aluminum clad wood windows. enlarge window opening, add new plywood to (e) wall, add new holddown anchor to (e) concrete. fire sprinker on unit 49 will be deffered submittal. | $40,000 |
| Mar 19, 2013 | Completed final sign-off Jul 2013 | 259 Faxon Av | kitchen and bath remodel. 26 new recessed lights.Details
kitchen and bath remodel. 26 new recessed lights. | $12,000 |