Kat Construction
- Based in
- South San Francisco
- On San Francisco permits
- Aug 2012 to Apr 2021
- Last 24 months
- 0 permits filed
13 permits since 2000: 8 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 28, 2021 | Completed final sign-off Aug 2021 | 350 University St | renew permit application 201810294366, 201807235272. for final inspection all work is completed.Details
renew permit application 201810294366, 201807235272. for final inspection all work is completed. | |
| Jan 18, 2019 | Never finaled issued Jan 2020, no final | 350 University St | address complaint #201768834 to provide interior walls at 2nd floor to allow venting pipes from ground floor to ventilate through roof. to comply w/nov #201899231 along with bpa 201810294366. provide 4 ada restrooms.Details
address complaint #201768834 to provide interior walls at 2nd floor to allow venting pipes from ground floor to ventilate through roof. to comply w/nov #201899231 along with bpa 201810294366. provide 4 ada restrooms. | $20,000 |
| Oct 29, 2018 | Completed final sign-off Apr 2019 | 646 47th Av | revision to (e) 201809119672 add new bathroom to (e) walk in closetDetails
revision to (e) 201809119672 add new bathroom to (e) walk in closet | $10,000 |
| Oct 29, 2018 | Expired or cancelled expired Oct 2019 | 350 University St | revision to pa 201807235272. t.i of toilet, shower facilities at 1st & 2nd flr south wing drawings to show location of walls and plumbing layout locations.Details
revision to pa 201807235272. t.i of toilet, shower facilities at 1st & 2nd flr south wing drawings to show location of walls and plumbing layout locations. | |
| Jul 23, 2018 | Expired or cancelled expired Oct 2019 | 350 University St | remodel of existing bathrooms on first and 2nd floors. install new shower valves, sinks, toilets, shower pans, tiles, led electrical lighting with sesonr switch. install aDetails
remodel of existing bathrooms on first and 2nd floors. install new shower valves, sinks, toilets, shower pans, tiles, led electrical lighting with sesonr switch. install a | $80,000 |
| Nov 13, 2014 | Completed final sign-off Jun 2015 | 511 05th Av | new gas meter for each existing bbq and dryer. new gas meter and supbpanel for existing lightsDetails
new gas meter for each existing bbq and dryer. new gas meter and supbpanel for existing lights | $4,000 |
| Sep 24, 2014 | Completed final sign-off Dec 2014 | 49 Lucy St | new gas meter for exterior bbq and dryer, new electrical meter & sub panel for exterior lightsDetails
new gas meter for exterior bbq and dryer, new electrical meter & sub panel for exterior lights | $5,000 |
| Mar 27, 2014 | Completed final sign-off Mar 2014 | 1710 17th Av | revision 201304033699: as built at ground floor to add mechanical room, relocate fire door, change laundry to storageDetails
revision 201304033699: as built at ground floor to add mechanical room, relocate fire door, change laundry to storage | |
| Feb 7, 2014 | Completed final sign-off May 2015 | 65 Meda Av | (10) new light fixtures, exhaust flues, storm water containment system to comply nov#201344073Details
(10) new light fixtures, exhaust flues, storm water containment system to comply nov#201344073 | $1,500 |
| Jul 2, 2013 | Expired or cancelled cancelled Jan 2020 | 52 Washburn St | install new deck with glass partitions on roof.Details
install new deck with glass partitions on roof. | $15,000 |
| Apr 30, 2013 | Completed final sign-off Sep 2014 | 49 Lucy St | unit 49 only - remodel 1st floor - convert stor space into bedroom, family, playroom & full bath. replace windows with aluminum clad wood windows. enlarge window opening, add new plywood to (e) wall, add new holddown anchor to (e) concrete. fire sprinker on unit 49 will be deffered submittal.Details
unit 49 only - remodel 1st floor - convert stor space into bedroom, family, playroom & full bath. replace windows with aluminum clad wood windows. enlarge window opening, add new plywood to (e) wall, add new holddown anchor to (e) concrete. fire sprinker on unit 49 will be deffered submittal. | $40,000 |
| Mar 19, 2013 | Completed final sign-off Jul 2013 | 259 Faxon Av | kitchen and bath remodel. 26 new recessed lights.Details
kitchen and bath remodel. 26 new recessed lights. | $12,000 |
| Aug 21, 2012 | Never finaled issued Dec 2012, no final | 77 Caine Av | comply w/complaint #200917962 - repair stairs & eave at front. all work less than 50%.Details
comply w/complaint #200917962 - repair stairs & eave at front. all work less than 50%. | $8,000 |