Back to kitchen remodel contractors
Kasten Builders/Creative Contr.Of Calif
- Based in
- Richmond
- On San Francisco permits
- Feb 2009 to Dec 2021
- Last 24 months
- 0 permits filed
24 permits since 2000: 17 completed, 2 never finaled, 5 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 expired or cancelled. Typically 168 days from filing to permit and 484 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 17, 2021 | Completed final sign-off Oct 2022 | 284 Mallorca Wy | interior renovation only: replace kitchen countertop, add backsplash (e) fixtures & appliances to remain. convert wood burning fireplace to gas. replace all fixtures & finishes in bath 1. replace all fixtures & finishes in bath 2 & incoporate closet into bath 2 footprint.Details
interior renovation only: replace kitchen countertop, add backsplash (e) fixtures & appliances to remain. convert wood burning fireplace to gas. replace all fixtures & finishes in bath 1. replace all fixtures & finishes in bath 2 & incoporate closet into bath 2 footprint. | $100,000 |
| Oct 31, 2019 | Completed final sign-off Aug 2023 | 469 Noriega St | horizontal addition, (n) front balcony, (n) pv roof panels. voluntary seismic strengthing, kitchen & bathroom renovation. rear yard retaining wall. (n) driveway, (n) sideyard stairs. replace (e) windows, (e) roof, (e)siding & (e) electrical services. (n) plumbing as needed.Details
horizontal addition, (n) front balcony, (n) pv roof panels. voluntary seismic strengthing, kitchen & bathroom renovation. rear yard retaining wall. (n) driveway, (n) sideyard stairs. replace (e) windows, (e) roof, (e)siding & (e) electrical services. (n) plumbing as needed. | $396,825 |
| Jul 3, 2013 | Completed final sign-off Dec 2015 | 2619 Pine St | renovation of two units bldg. the top unit renovation include a new kitchen & bath. the lower unit renovation w/ new 2 story addition added; includes new kitchen & 2-1/2 baths. all new electric & plumbing to be provided.Details
renovation of two units bldg. the top unit renovation include a new kitchen & bath. the lower unit renovation w/ new 2 story addition added; includes new kitchen & 2-1/2 baths. all new electric & plumbing to be provided. | $375,000 |
| Jun 29, 2010 | Expired or cancelled expired Jul 2011 | 75 Sotelo Av | kitchen and bath remodel. no walls being moved. interior work only, 1 window replacement at kitchen, not visible from street.Details
kitchen and bath remodel. no walls being moved. interior work only, 1 window replacement at kitchen, not visible from street. | $45,000 |
| Dec 2, 2009 | Completed final sign-off Jun 2011 | 60 San Felipe Av | add a one story 510 sq ft master bedroom addition onto the rear of an existing house. remodel work in the (e) house involves the kitchen, bathrooms, bedrooms, living & dining rooms. replace (e) windows & add new window. raise roof over entry to align with existing roof.Details
add a one story 510 sq ft master bedroom addition onto the rear of an existing house. remodel work in the (e) house involves the kitchen, bathrooms, bedrooms, living & dining rooms. replace (e) windows & add new window. raise roof over entry to align with existing roof. | $400,000 |