Back to kitchen remodel contractors
Kaiwi General Contractor
- Based in
- San Francisco
- On San Francisco permits
- Feb 2025 to Jun 2026
- Last 24 months
- 8 permits filed
8 permits since 2000: 5 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 1 completed, 3 in progress. Typically 0 days from filing to permit and 113 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 5, 2026 | In progress issued Mar 2026 | 18 Dorado Tr | unit 3: kitchen renovation, replace cabinets, electrical outlets, faucets, sink, countertops, garbage disposal, oven replacement. like to likeDetails
unit 3: kitchen renovation, replace cabinets, electrical outlets, faucets, sink, countertops, garbage disposal, oven replacement. like to like | $25,000 |
| Dec 4, 2025 | In progress issued Dec 2025 | 623 26th Av | sub-panel replacment like to like. 100 amp. run new 20 amps wires to kitchen and bath. 2)kitchen remodeling, cabinets replace like to like. stone & back splash. relocate sink. 3) bath remodel-tub converting to walking shower. remove walking shower & install toilet. replace tiles and move vanity.Details
sub-panel replacment like to like. 100 amp. run new 20 amps wires to kitchen and bath. 2)kitchen remodeling, cabinets replace like to like. stone & back splash. relocate sink. 3) bath remodel-tub converting to walking shower. remove walking shower & install toilet. replace tiles and move vanity. | $25,000 |
| Sep 26, 2025 | In progress issued Sep 2025 | 2295 Vallejo St | kitchen renovation; demo cabinets, demo partition wall. replace cabinets with new layout and install new outlets and upgrade plumbing. replace sub panel like for like, complete rewiring of unit. bath remodeling; demo plumbing, electrical, tile replacement, vanity everything like for like.Details
kitchen renovation; demo cabinets, demo partition wall. replace cabinets with new layout and install new outlets and upgrade plumbing. replace sub panel like for like, complete rewiring of unit. bath remodeling; demo plumbing, electrical, tile replacement, vanity everything like for like. | $45,000 |
| May 15, 2025 | Completed final sign-off Sep 2025 | 462 London St | kitchen renovation. demo only base cabinets and countertop. install new base cabinets with new sink, new countertop, new faucet, new garbage disposal. new dishwasher, new backsplash. electrical sub panel and wiring throughout replace old 100a like to like 100a. all jobs will be like to like.Details
kitchen renovation. demo only base cabinets and countertop. install new base cabinets with new sink, new countertop, new faucet, new garbage disposal. new dishwasher, new backsplash. electrical sub panel and wiring throughout replace old 100a like to like 100a. all jobs will be like to like. | $8,000 |