Back to bathroom remodel contractors
Kadima-Schoepp, Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2013 to Jul 2023
- Last 24 months
- 0 permits filed
85 permits since 2000: 62 completed, 18 never finaled, 5 expired or cancelled.
Of the 18 never-finaled permits, 5 are 3 to 5 years old, 12 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
35 bathroom remodel permits: 29 completed, 5 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 142 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 10, 2023 | Completed final sign-off Jun 2024 | 21 University St | 426 sf rooms down addition add full bath provide 1 hr separation between garage and rooms downDetails
426 sf rooms down addition add full bath provide 1 hr separation between garage and rooms down | $50,000 |
| Nov 14, 2022 | Completed final sign-off Mar 2023 | 875 La Playa | one kitchen & one bath remodel: due to a water leak reinstall ight fixturesl replace shower valve, ne kitchen cabinets, counter top, new vanity, faucets, drywall repairsDetails
one kitchen & one bath remodel: due to a water leak reinstall ight fixturesl replace shower valve, ne kitchen cabinets, counter top, new vanity, faucets, drywall repairs | $38,000 |
| Aug 29, 2022 | Never finaled issued Aug 2022, no final | 100 Oak Park Dr | bathroom renovation in kind: gfci's oone bathtub, one shower pan, two bathroom fans, two shower valvesDetails
bathroom renovation in kind: gfci's oone bathtub, one shower pan, two bathroom fans, two shower valves | $40,000 |
| Jul 27, 2022 | Completed final sign-off Mar 2024 | 122 Hartford St | to comply with nov 202292914: (about 32 sf) dry rot repairs. kitchen remodel in kind, light fixtures, gfci's, switches, countertop faucet appliances. bathroom remodel tub, vanity, toilet, angle stops, p-traps & laundry hook ups. no structural alterations.Details
to comply with nov 202292914: (about 32 sf) dry rot repairs. kitchen remodel in kind, light fixtures, gfci's, switches, countertop faucet appliances. bathroom remodel tub, vanity, toilet, angle stops, p-traps & laundry hook ups. no structural alterations. | $75,000 |
| Jul 6, 2022 | Completed final sign-off May 2023 | 1128 Hampshire St | remodel kitchen, two bathrooms, one tub, one shower pan, add gfci's. bathroom fans install sub panel. no removal of wallsDetails
remodel kitchen, two bathrooms, one tub, one shower pan, add gfci's. bathroom fans install sub panel. no removal of walls | $80,000 |
| Jun 22, 2022 | Completed final sign-off Aug 2022 | 1500 Francisco St | unit #11: one kitchen remodel in-kind. light fixtures, cabinets, one bathroom remodel: tile & faucet, shower pan, tub, lights, gfci.Details
unit #11: one kitchen remodel in-kind. light fixtures, cabinets, one bathroom remodel: tile & faucet, shower pan, tub, lights, gfci. | $40,000 |
| Nov 10, 2021 | Completed final sign-off Aug 2022 | 21 University St | kitchen remodel, bathroom remodel of wing walls in kitchen, infill 2 windows.Details
kitchen remodel, bathroom remodel of wing walls in kitchen, infill 2 windows. | $60,000 |
| Mar 16, 2021 | Completed final sign-off Aug 2021 | 155 27th St | one kitchen remodle; cabinets, counter tops and new appliances. stive, range, microwave, dishwasher sink and faucet and refrigerator. (1) bathroom remodel vanity sink, toilet, fauccet, bathtub fixture. no change in layout of walls or openings.Details
one kitchen remodle; cabinets, counter tops and new appliances. stive, range, microwave, dishwasher sink and faucet and refrigerator. (1) bathroom remodel vanity sink, toilet, fauccet, bathtub fixture. no change in layout of walls or openings. | $40,000 |
| Feb 22, 2021 | Completed final sign-off Feb 2022 | 190 Los Palmos Dr | 3 bathroom: replace tub, toilet, sink flooring and plumb. fixtures same location; kitchen replace cabinets and countertop, flooring. repair steps (5) in rear in kind. all work be same location. landscape stair.Details
3 bathroom: replace tub, toilet, sink flooring and plumb. fixtures same location; kitchen replace cabinets and countertop, flooring. repair steps (5) in rear in kind. all work be same location. landscape stair. | $30,000 |
| Jan 23, 2020 | Completed final sign-off Jun 2020 | 282 Hearst Av | add full bath to 1st fl. demo wall between kitchen and living room. new railing at stairway. minor changes to bedroom doors, and closets . replace all ext windows. aluminum at front, vinyl at rear. replace front door with wood. garage door with aluminumDetails
add full bath to 1st fl. demo wall between kitchen and living room. new railing at stairway. minor changes to bedroom doors, and closets . replace all ext windows. aluminum at front, vinyl at rear. replace front door with wood. garage door with aluminum | $90,000 |
| Jan 23, 2020 | Completed final sign-off Feb 2021 | 1090 Eddy St | rev to pa201902082488: all work in unit 507: relocate kitchen add bedroom add full bathroom. add washer and dryer. remove/add interior walls. modify lighting.Details
rev to pa201902082488: all work in unit 507: relocate kitchen add bedroom add full bathroom. add washer and dryer. remove/add interior walls. modify lighting. | $75,000 |
| Dec 5, 2019 | Completed final sign-off Jun 2020 | 282 Hearst Av | remodel kitchen and (2) bathrooms on 2nd floor. all fixtures will remain in same locationDetails
remodel kitchen and (2) bathrooms on 2nd floor. all fixtures will remain in same location | $40,000 |
| Aug 19, 2019 | Completed final sign-off Jul 2022 | 1090 Eddy St | unit 106 - add bedroom & bath. remodel bath relocate kitchen remove/add interior walls. lighting to modified spaces. all work in unit 106Details
unit 106 - add bedroom & bath. remodel bath relocate kitchen remove/add interior walls. lighting to modified spaces. all work in unit 106 | $90,000 |
| Jun 10, 2019 | Never finaled issued Jun 2019, no final | 1090 Eddy St | unit #402: remove/add interior walls, remodel bath relocate kitchen, lighing to modified spaces. add new bedroom.Details
unit #402: remove/add interior walls, remodel bath relocate kitchen, lighing to modified spaces. add new bedroom. | $50,000 |
| Feb 8, 2019 | Never finaled issued Feb 2019, no final | 1090 Eddy St | #507 remodel kitchen + bathroom all new fixtures in same location all within unit.Details
#507 remodel kitchen + bathroom all new fixtures in same location all within unit. | $30,000 |
| Jan 14, 2019 | Completed final sign-off Apr 2019 | 1090 Eddy St | unit #608; kitchen remodel: new cabinet, (1) sink, new appliance. electrical upgrade. bath sink, toilet electrical upgrade. in unit same location.Details
unit #608; kitchen remodel: new cabinet, (1) sink, new appliance. electrical upgrade. bath sink, toilet electrical upgrade. in unit same location. | $24,000 |
| Jan 14, 2019 | Completed final sign-off Sep 2019 | 1090 Eddy St | unit #402: kitchen remodel: new cabinets, (1) sink, appliances countertop electrical upgrade. bathroom: new vanity electrical upgrade (1) vanity + sinkDetails
unit #402: kitchen remodel: new cabinets, (1) sink, appliances countertop electrical upgrade. bathroom: new vanity electrical upgrade (1) vanity + sink | $22,000 |
| Sep 18, 2018 | Completed final sign-off Feb 2019 | 1700 Octavia St | unit 401: rev to pa201807205145: relocate (e) kitchen, relocate bedroom & add one bedroom. remodel bathroom. add washer & dryer.Details
unit 401: rev to pa201807205145: relocate (e) kitchen, relocate bedroom & add one bedroom. remodel bathroom. add washer & dryer. | $15,000 |
| Jul 20, 2018 | Never finaled issued Jul 2018, no final | 1700 Octavia St | unit#401 - remodel kitchen cabinets, countertop, also #401 bathroom vanities, tiles in same location, no walls to be in filled, lighting to comply w/ cec 150(k) 30sqf kitchen/25 sqf bathroomDetails
unit#401 - remodel kitchen cabinets, countertop, also #401 bathroom vanities, tiles in same location, no walls to be in filled, lighting to comply w/ cec 150(k) 30sqf kitchen/25 sqf bathroom | $32,000 |
| Jun 20, 2018 | Completed final sign-off Aug 2018 | 530 Grove St | unit #10: remodel kitchen - install new kitchen counter tops, cabinets; replace seven doors within unit; and new vanity for bathroom in same location, no change in layouts and openingsDetails
unit #10: remodel kitchen - install new kitchen counter tops, cabinets; replace seven doors within unit; and new vanity for bathroom in same location, no change in layouts and openings | $27,000 |
| May 2, 2018 | Completed final sign-off Sep 2018 | 250 Point Lobos Av | unit remodel to #301: remodel kitchen, remodel existing bath & add bath. convert dining room to bedroom.Details
unit remodel to #301: remodel kitchen, remodel existing bath & add bath. convert dining room to bedroom. | $42,000 |
| Apr 11, 2018 | Completed final sign-off Sep 2019 | 1441 Plymouth Av | interior remodel to include. 1st floor: add new rooms to include 3 bed rooms, 2 baths, family room, and laundr. new interior stairs. 2nd floor: remodel kitchen and bath add 1 bath. replace entry steps and porch.Details
interior remodel to include. 1st floor: add new rooms to include 3 bed rooms, 2 baths, family room, and laundr. new interior stairs. 2nd floor: remodel kitchen and bath add 1 bath. replace entry steps and porch. | $350,000 |
| Mar 22, 2018 | Completed final sign-off May 2018 | 1811 Pierce St | unit #3: install new kitchen countertop, sink, appliances & fauet. in bathroom - countertop sink, electrical up to code in bathroom & kitchen. all fixtures will remain in same location. maher naDetails
unit #3: install new kitchen countertop, sink, appliances & fauet. in bathroom - countertop sink, electrical up to code in bathroom & kitchen. all fixtures will remain in same location. maher na | $16,000 |
| Mar 8, 2018 | Completed final sign-off May 2018 | 665 Geary St | #208 - replace 1 vanity & faucet drain in bathroom place kitchen appliances. install (2 light fixtures. all items remain in same locationDetails
#208 - replace 1 vanity & faucet drain in bathroom place kitchen appliances. install (2 light fixtures. all items remain in same location | $14,000 |
| Feb 26, 2018 | Completed final sign-off May 2018 | 65 Liberty St | unit 204: remodel kitchen (1) & (1) bathroom, new kitchen counter tops, appliances, sink, new bath tub vanity. new electrical upgrade in kitchen & bathroom.all same location.Details
unit 204: remodel kitchen (1) & (1) bathroom, new kitchen counter tops, appliances, sink, new bath tub vanity. new electrical upgrade in kitchen & bathroom.all same location. | $29,000 |
| Feb 2, 2018 | Completed final sign-off Jul 2018 | 1090 Eddy St | unit #101: revision to app#201801057965. reconfigure floor plan add 1 new bedroom and 1 bathroom. no change to exterior envelope. no floors added. comply with sffc 1103.7.6.1 for fire alarmDetails
unit #101: revision to app#201801057965. reconfigure floor plan add 1 new bedroom and 1 bathroom. no change to exterior envelope. no floors added. comply with sffc 1103.7.6.1 for fire alarm | |
| Jan 23, 2018 | Completed final sign-off Sep 2018 | 250 Point Lobos Av | unit #301: kitchen remodel; cabinets and countertops. bathroom remodel. no walls removed or infilled.Details
unit #301: kitchen remodel; cabinets and countertops. bathroom remodel. no walls removed or infilled. | $22,000 |
| Jan 5, 2018 | Completed final sign-off Jul 2018 | 1090 Eddy St | unit #101: remodel one kitchen, & one bathroom in unit #101 counter tops, electrical plugs & plumbing fixtures will be upgraded.Details
unit #101: remodel one kitchen, & one bathroom in unit #101 counter tops, electrical plugs & plumbing fixtures will be upgraded. | $22,000 |
| Nov 17, 2017 | Completed final sign-off Dec 2017 | 65 Liberty St | unit #304: one kitchen and cabinets, sink, countertop replacement, bathroom: 1 sink . install 1 subpanel and electrical upgrade. everything same. no change to walls and opening layoutDetails
unit #304: one kitchen and cabinets, sink, countertop replacement, bathroom: 1 sink . install 1 subpanel and electrical upgrade. everything same. no change to walls and opening layout | $22,000 |
| Aug 17, 2017 | Completed final sign-off Oct 2017 | 250 Point Lobos Av | unit #302: remodel kitchen and bathroom. electrical will be upgraded and plumbing, (1) subpanel, (2) sinks, (1) dishwasher, (1) range hood, (1) stove, (1) toilet, 91) fan, in same location. no wall modification. no structural workDetails
unit #302: remodel kitchen and bathroom. electrical will be upgraded and plumbing, (1) subpanel, (2) sinks, (1) dishwasher, (1) range hood, (1) stove, (1) toilet, 91) fan, in same location. no wall modification. no structural work | $22,000 |
| Jun 19, 2017 | Never finaled issued Jun 2017, no final | 1925 Pierce St | #6- kitchen remodel with new fixtures, counter tops, cabinets, electrical fixture, range/stove/sink in same place, update electrical, sub panel, (1) living room fan & baths exhaust fan, electrical receptacles and (1) bathroom sink/fixtures.Details
#6- kitchen remodel with new fixtures, counter tops, cabinets, electrical fixture, range/stove/sink in same place, update electrical, sub panel, (1) living room fan & baths exhaust fan, electrical receptacles and (1) bathroom sink/fixtures. | $20,000 |
| Jun 6, 2017 | Completed final sign-off Jul 2017 | 65 Liberty St | unit 206: remodel (1) kitchen & (1) bathroom, all fixtures will be in same location as existing.Details
unit 206: remodel (1) kitchen & (1) bathroom, all fixtures will be in same location as existing. | $22,000 |
| Nov 2, 2016 | Completed final sign-off Mar 2017 | 250 Point Lobos Av | #404: reodel bathroom, all fixtures will remain in location approximately 45 sqft sink, toilet, cabinet, tub.Details
#404: reodel bathroom, all fixtures will remain in location approximately 45 sqft sink, toilet, cabinet, tub. | $3,900 |
| Apr 13, 2016 | Expired or cancelled expired Oct 2024 | 1544 45th Av | remodel to 2nd floor: rooms down addition to 1st floor. provide additional 2 bedrooms and 3 baths. relocate main entrance from 2nd to 1st. install tankless water heater and radiant heat floors throughout. seismic upgrade to all floors.Details
remodel to 2nd floor: rooms down addition to 1st floor. provide additional 2 bedrooms and 3 baths. relocate main entrance from 2nd to 1st. install tankless water heater and radiant heat floors throughout. seismic upgrade to all floors. | $310,000 |
| Mar 20, 2014 | Completed final sign-off May 2015 | 1045 Cabrillo St | comply with nov 200684393 and 200992581: items #2-#8, #10-#14 and #17. #4 under seperate permit. remodel to all units. remove/add interior non-bearing walls. remodel kitchens and baths. add a washer & dryer unit. new lighting to modified spaces. new vinyl light well window for bath.Details
comply with nov 200684393 and 200992581: items #2-#8, #10-#14 and #17. #4 under seperate permit. remodel to all units. remove/add interior non-bearing walls. remodel kitchens and baths. add a washer & dryer unit. new lighting to modified spaces. new vinyl light well window for bath. | $150,000 |