Block 0318, lot 019
665 Geary St
- City’s use
- Multi-Family Residential
- Built
- 1923
- Stories
- 5
- Units
- 39
- Rooms
- 39 bathrooms
- Building
- 18,617 sq ft
- Lot
- 5,018 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
25 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 28, 2023 | Completed final sign-off Jun 2023 | 665 Geary St | Everest Waterproofing & Restoration Inc. | exterior concrete spalling repair of south, west & partial east facades including sealing & painting. no work at front facade.Details
exterior concrete spalling repair of south, west & partial east facades including sealing & painting. no work at front facade. | $28,000 |
| Mar 13, 2023 | Completed final sign-off Jul 2023 | 665 Geary St | Bkr Services Inc Dba Bkr Construction Se | apt 405: remodel kitchen and bathroom. install new sheetrock, insulation flooring. isntall new cabinet and applicances. no change in wall or windows. mold remidiation as necessary. to comply with nov 202303894. interior by others under pa202303133544.Details
apt 405: remodel kitchen and bathroom. install new sheetrock, insulation flooring. isntall new cabinet and applicances. no change in wall or windows. mold remidiation as necessary. to comply with nov 202303894. interior by others under pa202303133544. | $55,000 |
| Mar 13, 2023 | Never finaled issued Mar 2023, no final | 665 Geary St | Environmental Remedies | apt 405: remove and dispose of capret and pad throughout unit (480sf). remove and dispolose of plaster and lathe from all walls and ceililng (1650) mold remediation. apt/unit refurbishment by others under pa 202303133541. to comply with nov202303894.Details
apt 405: remove and dispose of capret and pad throughout unit (480sf). remove and dispolose of plaster and lathe from all walls and ceililng (1650) mold remediation. apt/unit refurbishment by others under pa 202303133541. to comply with nov202303894. | $37,500 |
| Apr 15, 2021 | Completed final sign-off Mar 2022 | 665 Geary St | Commercial Fire Protection Inc | install low frequency sounders to meet 75db at the pillow per sffc section 1103.7.6.1 and replace the existing fire alarm control panel.Details
install low frequency sounders to meet 75db at the pillow per sffc section 1103.7.6.1 and replace the existing fire alarm control panel. | $70,200 |
| Mar 8, 2018 | Completed final sign-off May 2018 | 665 Geary St | Kadima-Schoepp, Inc | #208 - replace 1 vanity & faucet drain in bathroom place kitchen appliances. install (2 light fixtures. all items remain in same locationDetails
#208 - replace 1 vanity & faucet drain in bathroom place kitchen appliances. install (2 light fixtures. all items remain in same location | $14,000 |
| Jan 22, 2018 | Never finaled issued Jan 2018, no final | 665 Geary St | Tabernus Service Company | unit 403: kitchen cabinets & counter tops. subcontract-plumbing-kitchen facuet & supply lines. maher naDetails
unit 403: kitchen cabinets & counter tops. subcontract-plumbing-kitchen facuet & supply lines. maher na | $21,000 |
| Mar 20, 2017 | Completed final sign-off Jun 2017 | 665 Geary St | Tabernus Service Company | unit #202; remove & replace upper & lower kitchen cabinets & tiled kitchen floor. remove & replace bathroom vanity & medicine cabinet & tiled bathroom floor.Details
unit #202; remove & replace upper & lower kitchen cabinets & tiled kitchen floor. remove & replace bathroom vanity & medicine cabinet & tiled bathroom floor. | $12,000 |
| Mar 1, 2016 | Never finaled issued Mar 2016, no final | 665 Geary St | Tabernus Service Company | to comply with complaint #201549451. remodel kitchen: new counters, new cabinets, sink & faucet, range fan, led lighting. remodel bathroom: new shower tub, vanity, low flow toilet, shower valve, switches & outlets, gfi, new high efficency lighting, electrical panel install in unit. work are withinDetails
to comply with complaint #201549451. remodel kitchen: new counters, new cabinets, sink & faucet, range fan, led lighting. remodel bathroom: new shower tub, vanity, low flow toilet, shower valve, switches & outlets, gfi, new high efficency lighting, electrical panel install in unit. work are within | $22,000 |
| Dec 14, 2015 | Completed final sign-off Jan 2016 | 665 Geary St | Tabernus Service Company | unit# 406. high efficiency light fixts. remove & replace bathrm fixts. location not moved, paint & flooring. no structural work. n/a for maher.Details
unit# 406. high efficiency light fixts. remove & replace bathrm fixts. location not moved, paint & flooring. no structural work. n/a for maher. | $10,000 |
| Dec 14, 2015 | Completed final sign-off Jan 2016 | 665 Geary St | Tabernus Service Company | unit# 506. high efficiency light fixts. remove & replace bathrm fixts & kitchen fixts, cabinets. location not moved, paint & flooring. no structural work. n/a for maher. to comply w/ complaint#201549451.Details
unit# 506. high efficiency light fixts. remove & replace bathrm fixts & kitchen fixts, cabinets. location not moved, paint & flooring. no structural work. n/a for maher. to comply w/ complaint#201549451. | $10,000 |
| Oct 7, 2015 | Completed final sign-off Dec 2015 | 665 Geary St | Tabernus Service Company | apt 306 - remodel kitchen and bathroom. bathroom and kitchen getting high eff. light fixtures. exhaust fan will tin in to existing vent.Details
apt 306 - remodel kitchen and bathroom. bathroom and kitchen getting high eff. light fixtures. exhaust fan will tin in to existing vent. | $10,500 |
| Oct 7, 2015 | Completed final sign-off Jan 2016 | 665 Geary St | Tabernus Service Company | apt 405 - kitchen & bathroom remodel. to comply with complaint 201408331 & 201530301Details
apt 405 - kitchen & bathroom remodel. to comply with complaint 201408331 & 201530301 | $10,500 |
| Jul 9, 2015 | Never finaled issued Jul 2015, no final | 665 Geary St | S Q Garage Door | unit #502: to comply with complaint #201549451: new counter, cabniets, new shower shower/tub, vanity, toilets, shower valve;maher n/aDetails
unit #502: to comply with complaint #201549451: new counter, cabniets, new shower shower/tub, vanity, toilets, shower valve;maher n/a | $10,000 |
| Jul 9, 2015 | Never finaled issued Jul 2015, no final | 665 Geary St | S Q Garage Door | apt #506: comply to complaint 201549451; new counter,new cabinets,new shower tub,new vanity,toilet shower valve, switch,outlets, gfci,new lights, patch holes new tiles; maher n/aDetails
apt #506: comply to complaint 201549451; new counter,new cabinets,new shower tub,new vanity,toilet shower valve, switch,outlets, gfci,new lights, patch holes new tiles; maher n/a | $10,000 |
| Jul 9, 2015 | Completed final sign-off Sep 2015 | 665 Geary St | S Q Garage Door | apt #504: comply to complaint 201549451; new counter,new cabinets,new shower tub,new vanity,toilet shower valve, switch,outlets, gfci,new lights, patch holes new tiles; maher n/aDetails
apt #504: comply to complaint 201549451; new counter,new cabinets,new shower tub,new vanity,toilet shower valve, switch,outlets, gfci,new lights, patch holes new tiles; maher n/a | $10,000 |
| May 19, 2015 | Completed final sign-off Aug 2015 | 665 Geary St | S Q Garage Door | unit #304: to comply with complaints: pid 201538842, bid 201547971; his 201530301; 201543241; 201409331: sheetrock, new cabinets, countertops, shower, tub, vanity, toilet, shower tile, outlets and switches and change out 3 windows - size for size. maher na. no structural work.Details
unit #304: to comply with complaints: pid 201538842, bid 201547971; his 201530301; 201543241; 201409331: sheetrock, new cabinets, countertops, shower, tub, vanity, toilet, shower tile, outlets and switches and change out 3 windows - size for size. maher na. no structural work. | $12,000 |
| Jan 13, 2015 | Never finaled issued Jan 2015, no final | 665 Geary St | G R C Roofing Inc. | re-roofingDetails
re-roofing | $39,900 |
| Dec 23, 2014 | Never finaled issued Dec 2014, no final | 665 Geary St | Park View Construction | to comply with nov# 201408331 items 1-12. no walls moved, removed or added. all layouts to remain unchanged.Details
to comply with nov# 201408331 items 1-12. no walls moved, removed or added. all layouts to remain unchanged. | $3,000 |
| Oct 18, 2012 | Completed final sign-off Feb 2013 | 665 Geary St | Ampex Engineering & Co | unit #205-remodel (e) kitchen & bathroom as (e) layout to remain. new sheetrock on ceiling & walls for living room in unit #205. all lighting & bathroom/kitchen shall be flourscent. new exhaust pan in bathroom (3' away from pl & bldg opening), install new carbon monoxide alarmDetails
unit #205-remodel (e) kitchen & bathroom as (e) layout to remain. new sheetrock on ceiling & walls for living room in unit #205. all lighting & bathroom/kitchen shall be flourscent. new exhaust pan in bathroom (3' away from pl & bldg opening), install new carbon monoxide alarm | $18,000 |
| Apr 1, 2011 | Completed final sign-off Apr 2011 | 665 Geary St | Campione Construction | unit # 407: to complete work and obtain final inspection for work approved under pa # 200711087647. see n.o.v. 200726216Details
unit # 407: to complete work and obtain final inspection for work approved under pa # 200711087647. see n.o.v. 200726216 | $5,000 |
| Jan 8, 2009 | Never finaled issued Jan 2009, no final | 665 Geary St | sidewalk permit only.Details
sidewalk permit only. | ||
| Feb 4, 2008 | Expired or cancelled expired Mar 2011 | 665 Geary St | Cornerstone General Construction | work @ unit# 503 only. drywall repairs, upgrade electrical in unit, change 1 bath tub and sink and paint unit inside.Details
work @ unit# 503 only. drywall repairs, upgrade electrical in unit, change 1 bath tub and sink and paint unit inside. | $3,000 |
| Nov 8, 2007 | Expired or cancelled expired May 2015 | 665 Geary St | to comply with nov#200726216. remodel kitchen + bathroom no building permit unit#407.Details
to comply with nov#200726216. remodel kitchen + bathroom no building permit unit#407. | $15,000 | |
| Feb 28, 2007 | Never finaled issued Feb 2007, no final | 665 Geary St | street space & sidewalkDetails
street space & sidewalk | ||
| Apr 16, 2003 | Expired or cancelled expired May 2015 | 665 Geary St | A A A Security Systems | install&update fire alarm sys/smoke,pull station,horn strobe sys. new panel per cbc 310.10 & nfpa72.Details
install&update fire alarm sys/smoke,pull station,horn strobe sys. new panel per cbc 310.10 & nfpa72. | $10,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Tabernus Service Company (7), S Q Garage Door (4), A A A Security Systems, Ampex Engineering & Co, Bkr Services Inc Dba Bkr Construction Se, Campione Construction, Commercial Fire Protection Inc, Cornerstone General Construction, Environmental Remedies, Everest Waterproofing & Restoration Inc., G R C Roofing Inc., Kadima-Schoepp, Inc, Park View Construction
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.