Back to bathroom remodel contractors
K Y J Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Apr 2001 to Jul 2026
- Last 24 months
- 23 permits filed
85 permits since 2000: 46 completed, 15 in progress, 4 never finaled, 20 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 7 completed, 11 in progress, 1 never finaled, 1 expired or cancelled. Typically 13 days from filing to permit and 77 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2026 | In progress issued Jun 2026 | 1862 22nd Av | revision 202605141305- convert (e) media room and (e) storage to be (n) office and (n) bedrooms, add (n) bathroom at 1st floor. add 88sf in the garage, relocate (e) electrical meter and (e) gas meterDetails
revision 202605141305- convert (e) media room and (e) storage to be (n) office and (n) bedrooms, add (n) bathroom at 1st floor. add 88sf in the garage, relocate (e) electrical meter and (e) gas meter | $100,000 |
| May 14, 2026 | In progress issued May 2026 | 201 Molimo Dr | relocate stairway from basement to 1st fl and 1st fl to 2nd. relocate kitchen to 1st fl. convert partial garage space into new kitchen 6.97 sq ft. add new bedroom 1 and 4 2nd fl. new bath 2nd fl. replace e water heater and e furnace.Details
relocate stairway from basement to 1st fl and 1st fl to 2nd. relocate kitchen to 1st fl. convert partial garage space into new kitchen 6.97 sq ft. add new bedroom 1 and 4 2nd fl. new bath 2nd fl. replace e water heater and e furnace. | $100,000 |
| May 6, 2026 | In progress issued Jun 2026 | 5416 Fulton St | residential remodel to add 2 bedrooms. relocate kitchen, remodel baths, add 1 shower. all windows to remain. addition to lower level conditioned space.Details
residential remodel to add 2 bedrooms. relocate kitchen, remodel baths, add 1 shower. all windows to remain. addition to lower level conditioned space. | $35,000 |
| Apr 15, 2026 | Expired or cancelled withdrawn May 2026 | 5416 Fulton St | #5416: add 2 bedrooms. relocate kitchen. remodel bathrooms. add shower stall.Details
#5416: add 2 bedrooms. relocate kitchen. remodel bathrooms. add shower stall. | $89,500 |
| Mar 19, 2026 | In progress issued May 2026 | 129 12th Av | revision to # 202509235890: 3/f - amend presentation of lightwell area above interior stairs to reflect site more accurately. keep (e) window in master bath. amend master bath. provide 4 skylights. 2/f: keep (e) windows in master bath. amend master bath. voluntary strengthening of 4 bay windows.Details
revision to # 202509235890: 3/f - amend presentation of lightwell area above interior stairs to reflect site more accurately. keep (e) window in master bath. amend master bath. provide 4 skylights. 2/f: keep (e) windows in master bath. amend master bath. voluntary strengthening of 4 bay windows. | $15,000 |
| Mar 13, 2026 | In progress issued Mar 2026 | 201 Molimo Dr | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $11,000 |
| Feb 23, 2026 | In progress issued May 2026 | 5414 Fulton St | unit 5414 - remodel kitchen; remodel bathroom and add 1 shower; add 1 bedroom; no structural work. work on top unit onlyDetails
unit 5414 - remodel kitchen; remodel bathroom and add 1 shower; add 1 bedroom; no structural work. work on top unit only | $30,000 |
| Dec 3, 2025 | Completed final sign-off Sep 2026 | 1101 Sloat Bl | convert partial e) garage to be n) bedroom & powder rm (389.82 sf) convert e) deck into new office at 1st/f (54.58 sf). replace e) window to n) sliding door @ 1st/f. remodel e) bath & add new bath @ 2nd/f. relocate/replace washer/dryer. relocate e) electrical meter. new window thru outDetails
convert partial e) garage to be n) bedroom & powder rm (389.82 sf) convert e) deck into new office at 1st/f (54.58 sf). replace e) window to n) sliding door @ 1st/f. remodel e) bath & add new bath @ 2nd/f. relocate/replace washer/dryer. relocate e) electrical meter. new window thru out | $20,000 |
| Sep 23, 2025 | In progress issued Sep 2025 | 129 12th Av | interior remodeling of duplex for 2nd and 3rd floors, remove existing fireplace, remodel existing kitchen, remodel existing bath, provide new bath, remodel living & dining rooms, provide new window at master bedroom, provide laundry machine at 2nd floor, provide laundry in garage floor.Details
interior remodeling of duplex for 2nd and 3rd floors, remove existing fireplace, remodel existing kitchen, remodel existing bath, provide new bath, remodel living & dining rooms, provide new window at master bedroom, provide laundry machine at 2nd floor, provide laundry in garage floor. | $180,000 |
| Sep 23, 2025 | Completed final sign-off Jun 2026 | 1350 Plymouth Av | revision to pa#2025-0428-5339. relocate 1st floor bathroom and re-layout 2nd floor kitchen, update structural to match.Details
revision to pa#2025-0428-5339. relocate 1st floor bathroom and re-layout 2nd floor kitchen, update structural to match. | |
| Jun 26, 2025 | In progress issued Nov 2025 | 634 22nd Av | 1)extend rear deck 188.79 sq ft. 2)add new french door at 3rd floor. 3)replace glass railing for existing outdoor stair. 4)construction revision of approved pa #202506057994 for 3rd floor bathroom and stair.Details
1)extend rear deck 188.79 sq ft. 2)add new french door at 3rd floor. 3)replace glass railing for existing outdoor stair. 4)construction revision of approved pa #202506057994 for 3rd floor bathroom and stair. | $30,000 |
| Jun 11, 2025 | In progress issued Jul 2025 | 634 22nd Av | add 969.14 sqft at basement. add (n) powder room and (n) bath at basement. add (n) family room & (n) bedroom at basement. add (n) windows at basement. add (n) media room at basement. replace (e) furnace. replace water heater with tankless water heater. replace/relocate washer dryerDetails
add 969.14 sqft at basement. add (n) powder room and (n) bath at basement. add (n) family room & (n) bedroom at basement. add (n) windows at basement. add (n) media room at basement. replace (e) furnace. replace water heater with tankless water heater. replace/relocate washer dryer | $60,000 |
| Jun 5, 2025 | In progress issued Jun 2025 | 634 22nd Av | 1) add (n) powder room and remodel (e) bath at 1st flr. 2) relocate (e) kitchen at 1st flr. 3) relocate (e) dining room at 1st flr. 4) replace (e) window into (n) nana door at 1st flr. 5) remodel (e) primary bath at 2nd flr. 6) replace (e) window into (n) french door at 2nd flr. 7) add four (n)Details
1) add (n) powder room and remodel (e) bath at 1st flr. 2) relocate (e) kitchen at 1st flr. 3) relocate (e) dining room at 1st flr. 4) replace (e) window into (n) nana door at 1st flr. 5) remodel (e) primary bath at 2nd flr. 6) replace (e) window into (n) french door at 2nd flr. 7) add four (n) | $50,000 |
| Apr 28, 2025 | Completed final sign-off Jun 2026 | 1350 Plymouth Av | 1) ground floor remodel: adding living space (900 sqft) included two bedrooms, one bedroom, one family room with wet bar. 2) upper floor remodel: relocated kitchen and staircase. bathroom remodel and add one new bathroom. 3 new furnance, new tankless water heater.Details
1) ground floor remodel: adding living space (900 sqft) included two bedrooms, one bedroom, one family room with wet bar. 2) upper floor remodel: relocated kitchen and staircase. bathroom remodel and add one new bathroom. 3 new furnance, new tankless water heater. | $300,000 |
| Nov 21, 2024 | In progress issued Feb 2026 | 1865 23rd Av | interior reno for 1st & 2nd fl. 1st fl - relocate bathrm, bedrm & laundry; infill internal stiar connects to 2nd fl; 2nd fl - convert bedrm #1 into suite access to new deck @ rear yard. convert part of bedrm #2, relocate bathrm & powder room into office & bathroom. convert bedrm #3 into diningDetails
interior reno for 1st & 2nd fl. 1st fl - relocate bathrm, bedrm & laundry; infill internal stiar connects to 2nd fl; 2nd fl - convert bedrm #1 into suite access to new deck @ rear yard. convert part of bedrm #2, relocate bathrm & powder room into office & bathroom. convert bedrm #3 into dining | $60,000 |
| Nov 17, 2021 | Completed final sign-off Jan 2022 | 25 Sunview Dr | in-kind remodeling of 1 bathroom(s) in basement with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in basement with 1 shower pan(s). | $13,000 |
| Dec 17, 2019 | Completed final sign-off Mar 2020 | 880 Ashbury St | remodel master bath, all fixtures at same location.Details
remodel master bath, all fixtures at same location. | $6,000 |
| Jul 27, 2007 | Never finaled issued Jul 2007, no final | 2022 24th Av | paint interior & exterior of house. replace kitchen floor, tiles. replace kitchen cabinets in same location. replace bathroom wall & floor tiles. replace bathroom vanity. 50% of lighting shall be flourescent.Details
paint interior & exterior of house. replace kitchen floor, tiles. replace kitchen cabinets in same location. replace bathroom wall & floor tiles. replace bathroom vanity. 50% of lighting shall be flourescent. | $15,000 |
| Mar 22, 2005 | Completed final sign-off Jun 2005 | 262 27th Av | repair dryrotted walls of (e)bathroom on g/f & replace (e)plumbing fixtures with (n)fixturesDetails
repair dryrotted walls of (e)bathroom on g/f & replace (e)plumbing fixtures with (n)fixtures | $2,000 |
| Aug 26, 2004 | Completed final sign-off Sep 2004 | 2 Emery Ln | refurbish (e) bathroom on 3rd floor - comply w/ h.i.s. n.o.v. #200451981Details
refurbish (e) bathroom on 3rd floor - comply w/ h.i.s. n.o.v. #200451981 | $2,000 |