Block 1673, lot 023
5416 Fulton St
- City’s use
- Multi-Family Residential
- Built
- 1925
- Stories
- 2
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 2,860 sq ft
- Lot
- 2,500 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 6, 2026 | In progress issued Jun 2026 | 5416 Fulton St | K Y J Construction Company | residential remodel to add 2 bedrooms. relocate kitchen, remodel baths, add 1 shower. all windows to remain. addition to lower level conditioned space.Details
residential remodel to add 2 bedrooms. relocate kitchen, remodel baths, add 1 shower. all windows to remain. addition to lower level conditioned space. | $35,000 |
| Apr 15, 2026 | Expired or cancelled withdrawn May 2026 | 5416 Fulton St | K Y J Construction Company | #5416: add 2 bedrooms. relocate kitchen. remodel bathrooms. add shower stall.Details
#5416: add 2 bedrooms. relocate kitchen. remodel bathrooms. add shower stall. | $89,500 |
| Feb 23, 2026 | In progress issued May 2026 | 5414 Fulton St | K Y J Construction Company | unit 5414 - remodel kitchen; remodel bathroom and add 1 shower; add 1 bedroom; no structural work. work on top unit onlyDetails
unit 5414 - remodel kitchen; remodel bathroom and add 1 shower; add 1 bedroom; no structural work. work on top unit only | $30,000 |
| Sep 30, 2025 | Expired or cancelled withdrawn May 2026 | 5416 Fulton St | Merge Construction Service | interior remodel of all units to relocate kitchen and install new cabinets, appliances, lighting and fixtures. new bedroom layouts for all units and expansion of the unit at ground level.Details
interior remodel of all units to relocate kitchen and install new cabinets, appliances, lighting and fixtures. new bedroom layouts for all units and expansion of the unit at ground level. | $75,000 |
| Apr 6, 2016 | Completed final sign-off May 2016 | 5416 Fulton St | He & Kuang Inc | remodel bathroom - upgrade electrical, replace a bathtub, a shower faucet & vanity, tile floor & walls. no structural change.Details
remodel bathroom - upgrade electrical, replace a bathtub, a shower faucet & vanity, tile floor & walls. no structural change. | $6,000 |
| Oct 6, 2008 | Completed final sign-off May 2016 | 5416 Fulton St | Kum Lun Wong Construction | repair dryrot @ rear deck. (non structural work) approx. 12 sf decking.Details
repair dryrot @ rear deck. (non structural work) approx. 12 sf decking. | $1,500 |
| Apr 29, 2000 | Expired or cancelled expired Oct 2000 | 5416 Fulton St | Rescue Roofing Co | reroofingDetails
reroofing | $6,600 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- K Y J Construction Company (3), He & Kuang Inc, Kum Lun Wong Construction, Merge Construction Service, Rescue Roofing Co
- Engineers
- Travis Tone Airola (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.