K T Planning & Construction
- Based in
- San Jose
- On San Francisco permits
- Nov 2004 to Aug 2007
- Last 24 months
- 0 permits filed
8 permits since 2000: 7 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 1 completed, 1 never finaled. Typically 0 days from filing to permit and 51 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2007 | Never finaled issued Aug 2007, no final | 450 30th St | remodel existing 1st floor to add full bthroom, enlarge family room, replace (e) door with (n) window, replace (e) window with (n) door and (n) window on side elevations, add laundry closet at 2nd floor, and remodel exterior stair to access side yard.Details
remodel existing 1st floor to add full bthroom, enlarge family room, replace (e) door with (n) window, replace (e) window with (n) door and (n) window on side elevations, add laundry closet at 2nd floor, and remodel exterior stair to access side yard. | $40,000 |
| May 21, 2007 | Completed final sign-off Jul 2007 | 257 Theresa St | rebuild dryrotted deck and staircase. comply with nov 200799520Details
rebuild dryrotted deck and staircase. comply with nov 200799520 | $10,000 |