K. Kinahan Construction
- Based in
- Petaluma
- On San Francisco permits
- Mar 2002 to Dec 2022
- Last 24 months
- 0 permits filed
27 permits since 2000: 22 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 0 days from filing to permit and 100 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 31, 2019 | Completed final sign-off Mar 2021 | 553 15th Av | replace entry stairs & adjacent guardrail walls, in-kind, due to extensive dry rot. replace in-kind w/terrazzo treadsDetails
replace entry stairs & adjacent guardrail walls, in-kind, due to extensive dry rot. replace in-kind w/terrazzo treads | $4,500 |
| Apr 5, 2016 | Completed final sign-off Jul 2018 | 1454 16th Av | project proposes an interior remodel to the upper and lower floor. the existing garage shall be remodeled to create new living space with an internal stair to living space above scope of work shall include new finishes, lighting, plumbing & seismic upgrades.Details
project proposes an interior remodel to the upper and lower floor. the existing garage shall be remodeled to create new living space with an internal stair to living space above scope of work shall include new finishes, lighting, plumbing & seismic upgrades. | $137,800 |
| Jun 4, 2013 | Completed final sign-off Sep 2013 | 1732 Santiago St | dry rot repairs under (e) front window, less than 50% on east side of stairsDetails
dry rot repairs under (e) front window, less than 50% on east side of stairs | $2,000 |
| Aug 28, 2007 | Completed final sign-off Aug 2007 | 41 Cervantes Bl | repair back stairs. take out all dry rot & replace with pressure treated lumber for stringers & supports & 2 x redwood for stepping. (less than 50% of stairs repaired).Details
repair back stairs. take out all dry rot & replace with pressure treated lumber for stringers & supports & 2 x redwood for stepping. (less than 50% of stairs repaired). | $5,500 |
| Oct 22, 2002 | Completed final sign-off Jan 2003 | 2528 Washington St | comply w/ nov#200233591 h.i.d. detail plan of stair case replacement required.Details
comply w/ nov#200233591 h.i.d. detail plan of stair case replacement required. | $1,500 |