K C Glass Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2006 to Sep 2025
- Last 24 months
- 3 permits filed
54 permits since 2000: 37 completed, 1 in progress, 13 never finaled, 3 expired or cancelled.
Of the 13 never-finaled permits, 7 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 2 days from filing to permit and 95 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 9, 2025 | Completed final sign-off Dec 2025 | 2270 North Point St | replace 62 existing steel windows retrofit with white vinyl double hung windows at rear of building, all windows will have dual glazing low-e with argongos. 2 windows in stairway will be aluminum casements, 1 window in stairway will be single hung. not street facing. all replaced in same size/locatiDetails
replace 62 existing steel windows retrofit with white vinyl double hung windows at rear of building, all windows will have dual glazing low-e with argongos. 2 windows in stairway will be aluminum casements, 1 window in stairway will be single hung. not street facing. all replaced in same size/locati | $200,000 |