Back to kitchen remodel contractors
K. Brunner & Associates
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Jun 2026
- Last 24 months
- 2 permits filed
67 permits since 2000: 56 completed, 2 in progress, 2 never finaled, 7 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 10 completed. Typically 0 days from filing to permit and 284 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 11, 2023 | Completed final sign-off Nov 2024 | 4119 Irving St | remodel kitchen and batroom in kind, no new structurl work. work is in upper unit. (4121). no wall change.Details
remodel kitchen and batroom in kind, no new structurl work. work is in upper unit. (4121). no wall change. | $12,500 |
| Nov 24, 2014 | Completed final sign-off Oct 2015 | 80 21st Av | interior remodel including kitchen, 3 baths, new lighting, demolition removal of interior bearing wall- add new structural beam and footings.Details
interior remodel including kitchen, 3 baths, new lighting, demolition removal of interior bearing wall- add new structural beam and footings. | $160,000 |
| Jan 2, 2014 | Completed final sign-off May 2014 | 1022 Sanchez St | remodel kitchen and two bathrooms, no exterior work , no structural work, no change on walls.Details
remodel kitchen and two bathrooms, no exterior work , no structural work, no change on walls. | $95,000 |
| Mar 1, 2012 | Completed final sign-off May 2013 | 680 Douglass St | replace kitchen & bathroom fixtures. non structural kitchen and bath remodel.Details
replace kitchen & bathroom fixtures. non structural kitchen and bath remodel. | $18,000 |
| Oct 5, 2011 | Completed final sign-off Jul 2012 | 501 El Camino Del Mar | remodel e 1-kitchen and 1-bathroom. remove non bearing partition. replace aluminum windows with new wood as noted, size changes. lighting to comply w/ cec 150(k)Details
remodel e 1-kitchen and 1-bathroom. remove non bearing partition. replace aluminum windows with new wood as noted, size changes. lighting to comply w/ cec 150(k) | $85,000 |
| May 30, 2007 | Completed final sign-off Oct 2007 | 3426 Divisadero St | remodel extg bath(shower+vanity) and kitchen. no new structural work. no exterior work. new tile in bath, new fixtures, new cabinets, appliances, electrical, plmg. kchn at least 50% lightihng wattage must be fluorescent. bahtroom fluorescent lighting or motion sensor controlDetails
remodel extg bath(shower+vanity) and kitchen. no new structural work. no exterior work. new tile in bath, new fixtures, new cabinets, appliances, electrical, plmg. kchn at least 50% lightihng wattage must be fluorescent. bahtroom fluorescent lighting or motion sensor control | $89,000 |
| Mar 11, 2004 | Completed final sign-off Dec 2004 | 1080 Chestnut St | remodel 2 (e) baths & 1 kitchen. new cabinets applances, fixtures. fixture locations/applicance locaDetails
remodel 2 (e) baths & 1 kitchen. new cabinets applances, fixtures. fixture locations/applicance loca | $65,000 |
| Sep 2, 2003 | Completed final sign-off Dec 2003 | 436 Vicente St | replace kitchen cabinets,appliances in extng locations sink in extng location/address. any dry rotDetails
replace kitchen cabinets,appliances in extng locations sink in extng location/address. any dry rot | $7,500 |
| Mar 5, 2002 | Completed final sign-off Apr 2003 | 50 21st Av | remodel 2 bathrms,1kitchen.replace cabinets,repair dryrot & termite damage.no new structural work.noDetails
remodel 2 bathrms,1kitchen.replace cabinets,repair dryrot & termite damage.no new structural work.no | $48,500 |
| Aug 8, 2001 | Completed final sign-off Nov 2001 | 4748 California St | remodel kitchen & bath. new fixtures, cab's flooring. new lighting. no structural work. no exteriorDetails
remodel kitchen & bath. new fixtures, cab's flooring. new lighting. no structural work. no exterior | $28,000 |