Back to kitchen remodel contractors
K B & B Construction Inc
- Based in
- Vacaville
- On San Francisco permits
- Apr 2022 to Oct 2025
- Last 24 months
- 6 permits filed
11 permits since 2000: 3 completed, 6 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 1 completed, 4 in progress, 1 expired or cancelled. Typically 45 days from filing to permit and 378 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 23, 2025 | In progress issued Jan 2026 | 1501 Guerrero St | rev to pa# 2025-0604-7861: relocate to garage add penisular at kitchenDetails
rev to pa# 2025-0604-7861: relocate to garage add penisular at kitchen | |
| Jun 4, 2025 | In progress issued Aug 2025 | 1501 Guerrero St | 1) kitchen and bathroom remodeling 2) add one full bathroom 3) remove non-bearing wall between living and dining 4) replace 3 windows, 2 in front and 1 in rear of bldg. 5) replace existing ceiling with 5/8" gyboard and recilent channelDetails
1) kitchen and bathroom remodeling 2) add one full bathroom 3) remove non-bearing wall between living and dining 4) replace 3 windows, 2 in front and 1 in rear of bldg. 5) replace existing ceiling with 5/8" gyboard and recilent channel | $150,000 |
| Apr 22, 2024 | In progress issued Mar 2025 | 2620 Vicente St | ground floor convert study to bedroom, addition of (1) (n) bathroom and kitchenette, relocate (e) bedroom, bathroom and family room. 2nd floor (upper level) addition of (n) exterior wood deck located at rear, (n) light at well. extend and remodel kitchen, add (n) study room.Details
ground floor convert study to bedroom, addition of (1) (n) bathroom and kitchenette, relocate (e) bedroom, bathroom and family room. 2nd floor (upper level) addition of (n) exterior wood deck located at rear, (n) light at well. extend and remodel kitchen, add (n) study room. | $250,000 |
| Mar 6, 2024 | In progress issued Mar 2024 | 1027 Ocean Av | connecting new water meter into the house and upgrading existing sub-panel and reaplce two broken windows u=.30max at rear of bldg. remodeling a kitchen and bathroom on 2nd flr in kind. in kind replacement no change.Details
connecting new water meter into the house and upgrading existing sub-panel and reaplce two broken windows u=.30max at rear of bldg. remodeling a kitchen and bathroom on 2nd flr in kind. in kind replacement no change. | $35,000 |
| Feb 27, 2024 | Completed final sign-off Mar 2025 | 525 Garfield St | adding a kitchenette into a (e) approved ground fl. permit #201307252765Details
adding a kitchenette into a (e) approved ground fl. permit #201307252765 | $25,000 |
| Apr 8, 2022 | Expired or cancelled expired Mar 2025 | 525 Garfield St | (1) kitchen & (2) bathroom remodel in-kind. rewire & remodel a kitchen and 2 bath room. rewire 2 bed room and livingroom upstair. re-sheetrock (max 1,000 sq. ft.). roof damaged repair of 20 sf. tile and cabinet install. new lighting shall comply w/cec 150.0(k)3 & (k)5.Details
(1) kitchen & (2) bathroom remodel in-kind. rewire & remodel a kitchen and 2 bath room. rewire 2 bed room and livingroom upstair. re-sheetrock (max 1,000 sq. ft.). roof damaged repair of 20 sf. tile and cabinet install. new lighting shall comply w/cec 150.0(k)3 & (k)5. | $30,000 |