Back to bathroom remodel contractors
K A Lau Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2005 to Aug 2026
- Last 24 months
- 46 permits filed
358 permits since 2000: 276 completed, 23 in progress, 49 never finaled, 10 expired or cancelled.
Of the 49 never-finaled permits, 5 are 3 to 5 years old, 20 are 5 to 10 years old, 24 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
169 bathroom remodel permits: 144 completed, 11 in progress, 12 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 166 days from permit to final inspection.
Showing the 100 most recent of 169.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 29, 2026 | In progress issued Jul 2026 | 425 01st St | unit #2602: kitchen remodel- replace cabinets, countertop, interior painting. 2 bathrooms remodel- replace electrical and plumbing fixture and replace tile. interior painting for unit. no wall relocation. new lighting shall comply with cec 150.0 (k)3 and (k)5.Details
unit #2602: kitchen remodel- replace cabinets, countertop, interior painting. 2 bathrooms remodel- replace electrical and plumbing fixture and replace tile. interior painting for unit. no wall relocation. new lighting shall comply with cec 150.0 (k)3 and (k)5. | $80,000 |
| Jul 14, 2026 | In progress issued Sep 2026 | 2100 31st Av | construct 1 bedroom, 1 full bath. relocate (e) kitchen, bedroom. remodel (e) bathroom, & replace (e) sheetrock w/ new at 2/f. construct family room, 1 full bath, & install wetbar at g/f.Details
construct 1 bedroom, 1 full bath. relocate (e) kitchen, bedroom. remodel (e) bathroom, & replace (e) sheetrock w/ new at 2/f. construct family room, 1 full bath, & install wetbar at g/f. | $250,000 |
| Jun 25, 2026 | In progress issued Jul 2026 | 3062 Franklin St | 3/f: to comply with nov# 202656971. legalize as-built non-bearing wall removal, bathroom remodel, and kitchen relocation. entirely remove as-built decking at rooftop. legalize as-built window alterations on 2/f & 3/f @ north facade.Details
3/f: to comply with nov# 202656971. legalize as-built non-bearing wall removal, bathroom remodel, and kitchen relocation. entirely remove as-built decking at rooftop. legalize as-built window alterations on 2/f & 3/f @ north facade. | $30,000 |
| Jun 18, 2026 | In progress issued Jun 2026 | 1131 Clay St | install laundry area on gr level. add 1/2 bath on 2nd level. rearrange layout 3rd level.Details
install laundry area on gr level. add 1/2 bath on 2nd level. rearrange layout 3rd level. | $35,000 |
| Jun 9, 2026 | In progress issued Jun 2026 | 88 King St | bathroom remodel - replace bathtub with shower, new flooringDetails
bathroom remodel - replace bathtub with shower, new flooring | $15,000 |
| May 21, 2026 | In progress issued Jun 2026 | 3060 Franklin St | to comply w/ complaints 202421659 and 202317490- clear debris from yard, remove scaffolds (item 2) 202429442 remove unpermitted siding and return to original. 3060 franklin: bathroom, laundry room, powderoom, kitchen remodel. 1271..Details
to comply w/ complaints 202421659 and 202317490- clear debris from yard, remove scaffolds (item 2) 202429442 remove unpermitted siding and return to original. 3060 franklin: bathroom, laundry room, powderoom, kitchen remodel. 1271.. | $20,000 |
| Apr 27, 2026 | In progress issued Apr 2026 | 448 Country Club Dr | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl with 0 shower pan(s). | $40,800 |
| Mar 31, 2026 | In progress issued Mar 2026 | 1237 27th Av | kitchen and bathroom remodel. no layout change. all work in kind.Details
kitchen and bathroom remodel. no layout change. all work in kind. | $60,000 |
| Mar 16, 2026 | Completed final sign-off Aug 2026 | 2442 44th Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $36,000 |
| Mar 9, 2026 | Completed final sign-off Jun 2026 | 1170 Sacramento St | unit 18c: remodel kitchem, guest bathroom, and 2 primary bathrooms. install new recessed lights, living area and hallways. new flooring, interior paint of unit. remodel in-kind, no layout change.Details
unit 18c: remodel kitchem, guest bathroom, and 2 primary bathrooms. install new recessed lights, living area and hallways. new flooring, interior paint of unit. remodel in-kind, no layout change. | $89,000 |
| Jan 22, 2026 | Completed final sign-off Jun 2026 | 1650 Jackson St | unit 509: bathroom remodel like for like. no layout change.Details
unit 509: bathroom remodel like for like. no layout change. | $10,000 |
| Jan 12, 2026 | Completed final sign-off May 2026 | 1085 Washington St | unit #201: kitchen remodel no layout change. bathroom remodel no layout change. update electrical with new subpanel, new flooring and interor painiting.Details
unit #201: kitchen remodel no layout change. bathroom remodel no layout change. update electrical with new subpanel, new flooring and interor painiting. | $38,000 |
| Dec 9, 2025 | Completed final sign-off Dec 2025 | 1840 Sacramento St | revision to pa#: 202508183275. install laundry hook up in bathroom.Details
revision to pa#: 202508183275. install laundry hook up in bathroom. | |
| Dec 8, 2025 | In progress issued Dec 2025 | 88 King St | kitchen remodel, no layout change. master bathroom remodel. no layout change. guest bathroom remodel. no lat change. replace hardwood floor and interiorDetails
kitchen remodel, no layout change. master bathroom remodel. no layout change. guest bathroom remodel. no lat change. replace hardwood floor and interior | $68,000 |
| Oct 30, 2025 | Completed final sign-off Mar 2026 | 22 West View Av | comply with complaint 2017761928. remove rooms, bathroom, and cabinets on ground level. infill door at front.Details
comply with complaint 2017761928. remove rooms, bathroom, and cabinets on ground level. infill door at front. | $20,000 |
| Sep 22, 2025 | Completed final sign-off Oct 2025 | 333 Main St | unit 5e revision to 202506259417: removing kitchen remodel from original work scope. only 2 bathroom remodels - like for like.Details
unit 5e revision to 202506259417: removing kitchen remodel from original work scope. only 2 bathroom remodels - like for like. | |
| Sep 2, 2025 | Completed final sign-off Dec 2025 | 1458 Church St | revision to permit: 202505277258; full bathroom remodel.Details
revision to permit: 202505277258; full bathroom remodel. | $40,000 |
| Aug 25, 2025 | Completed final sign-off Dec 2025 | 270 26th Av | unit #9: kitchen remodel and (2) bathroom remodel. no layout chnages. interior painting and electrical upgrade.Details
unit #9: kitchen remodel and (2) bathroom remodel. no layout chnages. interior painting and electrical upgrade. | $60,000 |
| Aug 18, 2025 | Completed final sign-off Dec 2025 | 1840 Sacramento St | unit 401: kitchen remodel & bathroom remodel. no layout change. interial painting and new flooring.Details
unit 401: kitchen remodel & bathroom remodel. no layout change. interial painting and new flooring. | $60,000 |
| Jun 25, 2025 | Completed final sign-off Oct 2025 | 333 Main St | 2 bathroom remodel 1 kitchen remodel no layout change (85 sq ft bath, 45 sq ft bath, 90 sq ft kitchen)Details
2 bathroom remodel 1 kitchen remodel no layout change (85 sq ft bath, 45 sq ft bath, 90 sq ft kitchen) | $65,000 |
| May 27, 2025 | Completed final sign-off Oct 2025 | 4430 Anza St | both units, 4430 & 4432 - 2 kitchen remodel, 4 bathroom remodel. no layout change. interior painting.Details
both units, 4430 & 4432 - 2 kitchen remodel, 4 bathroom remodel. no layout change. interior painting. | $60,000 |
| Mar 6, 2025 | Completed final sign-off Jul 2025 | 1840 Sacramento St | unit #403: kitchen and bathroom remodel no layout changeDetails
unit #403: kitchen and bathroom remodel no layout change | $50,000 |
| Mar 6, 2025 | Completed final sign-off Jul 2025 | 1840 Sacramento St | unit #301: kitchen and bathroom remodel no layout change no change in plumbing fixture countDetails
unit #301: kitchen and bathroom remodel no layout change no change in plumbing fixture count | $50,000 |
| Oct 15, 2024 | In progress issued Oct 2024 | 61 Cora St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $25,000 |
| Sep 30, 2024 | Completed final sign-off Dec 2024 | 1840 Sacramento St | unit# 203: kitchen and bath remodel. no structural changes.Details
unit# 203: kitchen and bath remodel. no structural changes. | $45,000 |
| Sep 30, 2024 | Completed final sign-off Apr 2025 | 2340 Filbert St | unit 10-kitchen and bath remodel. no sructural change.Details
unit 10-kitchen and bath remodel. no sructural change. | $45,000 |
| Jul 1, 2024 | Completed final sign-off Dec 2024 | 1840 Sacramento St | unit #103, #203 & #201 kitchen and bathroom remodel- no layout changeDetails
unit #103, #203 & #201 kitchen and bathroom remodel- no layout change | $110,000 |
| May 29, 2024 | Completed final sign-off Nov 2024 | 80 San Pablo Av | construct study room, media room, & bathroom at g/f. repair (e) interior staircase from 1/f to g/f.Details
construct study room, media room, & bathroom at g/f. repair (e) interior staircase from 1/f to g/f. | $111,300 |
| May 28, 2024 | Completed final sign-off Dec 2024 | 559 20th Av | to comply with complaint #202424011 remodel kitchen and bathroom. no layout changeDetails
to comply with complaint #202424011 remodel kitchen and bathroom. no layout change | $36,000 |
| Apr 19, 2024 | Completed final sign-off Nov 2024 | 80 San Pablo Av | one kitchen remodel and one bathroom remodel. no structural changes.Details
one kitchen remodel and one bathroom remodel. no structural changes. | $40,000 |
| Apr 12, 2024 | Completed final sign-off Sep 2024 | 1745 Buchanan St | kitchen remodel & bathrooms remodel - no wall changed. update electrical in the unitDetails
kitchen remodel & bathrooms remodel - no wall changed. update electrical in the unit | $60,000 |
| Apr 12, 2024 | Completed final sign-off Nov 2024 | 207 Gough St | unit 42: kitchen and bathroom remodel. electrical upgrade in the unitDetails
unit 42: kitchen and bathroom remodel. electrical upgrade in the unit | $50,000 |
| Apr 11, 2024 | In progress issued Jul 2024 | 969 Valencia St | repair fire damage to affected areas in building. restore apartment burned in fire (kitchen, bathroom, living room) and affected apartments. due to water and fire smoke damage, cosmetic work to be done such as painting, cleaning at lightwell on 2/f & 3/f.Details
repair fire damage to affected areas in building. restore apartment burned in fire (kitchen, bathroom, living room) and affected apartments. due to water and fire smoke damage, cosmetic work to be done such as painting, cleaning at lightwell on 2/f & 3/f. | $1,263,670 |
| Nov 7, 2023 | Completed final sign-off May 2025 | 2614 Sacramento St | revision under pa #202106182775: delete 1 bathroom, bedroom. relocate 1 bathroom at g/f. relocate powder room & hange single door to sliding door at 2/f. relocate closet at 3/f.Details
revision under pa #202106182775: delete 1 bathroom, bedroom. relocate 1 bathroom at g/f. relocate powder room & hange single door to sliding door at 2/f. relocate closet at 3/f. | |
| Nov 6, 2023 | Completed final sign-off Jul 2024 | 1106 Valencia St | unit b; kitchen and bathroom remodel. simliar in kind. electrical update in the unit interior paintingDetails
unit b; kitchen and bathroom remodel. simliar in kind. electrical update in the unit interior painting | $46,000 |
| Oct 10, 2023 | Completed final sign-off Sep 2024 | 242 12th Av | kitchen remodel- no structural chnage. upgrade electrical in the unit. replace exisitng kitchen window not street facing, same size and location. bathroom remodel- no structural change. interior painting.Details
kitchen remodel- no structural chnage. upgrade electrical in the unit. replace exisitng kitchen window not street facing, same size and location. bathroom remodel- no structural change. interior painting. | $60,000 |
| Sep 25, 2023 | Completed final sign-off May 2024 | 2620 Larkin St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $22,000 |
| Aug 22, 2023 | Completed final sign-off Sep 2024 | 2367 19th Av | construct 2 bedroom, 1 full bathroom, family room & kitchenette at g/f. remodel (e) kitchen, bathroom, & construct 1 3'x3' skylight at 2/f. construct new staircase from 2nd fl down to rear yard.Details
construct 2 bedroom, 1 full bathroom, family room & kitchenette at g/f. remodel (e) kitchen, bathroom, & construct 1 3'x3' skylight at 2/f. construct new staircase from 2nd fl down to rear yard. | $162,000 |
| May 25, 2023 | Completed final sign-off Oct 2023 | 838 25th Av | ground level- add 1 bedroom with walk-in closet, playroom and bathroomDetails
ground level- add 1 bedroom with walk-in closet, playroom and bathroom | $60,000 |
| May 9, 2023 | Completed final sign-off Dec 2023 | 834 32nd Av | ground level - add bathroom and family roomDetails
ground level - add bathroom and family room | $52,000 |
| Apr 26, 2023 | Never finaled issued Apr 2023, no final | 888 40th Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl with 0 shower pan(s). | $35,000 |
| Mar 30, 2023 | Completed final sign-off Dec 2023 | 207 Gough St | unit 36: kitchen remodel, bathroom remodel: update electrical: no structural changeDetails
unit 36: kitchen remodel, bathroom remodel: update electrical: no structural change | $50,000 |
| Feb 14, 2023 | Completed final sign-off Oct 2023 | 975 Valencia St | unit 3- one kitchen and 1 bath remodel, electrical upgrade: unit 8: 1 kitchen and 1 bath remodel, electrical upgradeDetails
unit 3- one kitchen and 1 bath remodel, electrical upgrade: unit 8: 1 kitchen and 1 bath remodel, electrical upgrade | $60,000 |
| Jan 26, 2023 | Completed final sign-off Jan 2024 | 2018 Sloat Bl | 1st/f: add bathroom in (e) room. 2nd/f: modify (e) bath, add 1 bathDetails
1st/f: add bathroom in (e) room. 2nd/f: modify (e) bath, add 1 bath | $45,000 |
| Jan 17, 2023 | Never finaled issued Jan 2023, no final | 1915 Judah St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $25,000 |
| Nov 17, 2022 | Completed final sign-off Apr 2023 | 641 Carolina St | one bathroom remodel- no wall changes no layout changesDetails
one bathroom remodel- no wall changes no layout changes | $12,000 |
| Jul 25, 2022 | Completed final sign-off Mar 2023 | 2428 Funston Av | construct bedroom, family room, office & 2 full bathroom. in-fill the open space under 2nd floor at g/f. remodel (e) kitchen, 2 (e) bathroom, & replace (e) sheet rock w/ new at 2nd floor.Details
construct bedroom, family room, office & 2 full bathroom. in-fill the open space under 2nd floor at g/f. remodel (e) kitchen, 2 (e) bathroom, & replace (e) sheet rock w/ new at 2nd floor. | $180,000 |
| Jul 6, 2022 | Completed final sign-off Mar 2023 | 2428 Funston Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $22,000 |
| Jun 23, 2022 | Completed final sign-off Mar 2023 | 207 Gough St | unit 28 - interior remodel: remodel kitchen/bath; replace/add new fixtures, counters & flooring; (n) lighting, fans, outlets and switchesDetails
unit 28 - interior remodel: remodel kitchen/bath; replace/add new fixtures, counters & flooring; (n) lighting, fans, outlets and switches | $36,000 |
| May 24, 2022 | Completed final sign-off Aug 2022 | 3337 Steiner St | unit #1: revision to pa# 202203180325. kitchen & bathroom remodel. upgrade electrical in unit. modify bathroom layout to install laundry area. close a pocket door between 2 rooms. dryrot repair due to water damage.Details
unit #1: revision to pa# 202203180325. kitchen & bathroom remodel. upgrade electrical in unit. modify bathroom layout to install laundry area. close a pocket door between 2 rooms. dryrot repair due to water damage. | $12,000 |
| May 2, 2022 | Never finaled filed May 2022, never issued | 72 Mill St | to comply with complaints 202057681, 202178471, 202185650. legalize rear deck. kitchen and bathroom (previously remodel) remodel in kind.Details
to comply with complaints 202057681, 202178471, 202185650. legalize rear deck. kitchen and bathroom (previously remodel) remodel in kind. | $15,000 |
| Mar 18, 2022 | Completed final sign-off Aug 2022 | 3337 Steiner St | 3337 steiner #1: kitchen and bathroom remodel. no wall change update electriacl in the unit. interior paint with new flooring.Details
3337 steiner #1: kitchen and bathroom remodel. no wall change update electriacl in the unit. interior paint with new flooring. | $40,000 |
| Jan 20, 2022 | Completed final sign-off Aug 2022 | 68 Dellbrook Av | add bathroom on ground level & legalizing family roomDetails
add bathroom on ground level & legalizing family room | $46,000 |
| Dec 14, 2021 | Completed final sign-off Mar 2022 | 135 Balceta Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $14,000 |
| Nov 15, 2021 | Completed final sign-off Aug 2022 | 1170 Sacramento St | unit 9c: 3 bathrooms remodel: replace plumbing, electrical fixtures, tiles: kitchen remodel: replace kitchen cabinets, plumbing, and electrical fixtures. install room lights in bedrooms and livingroom. no layout change. replace in kind, no structuralDetails
unit 9c: 3 bathrooms remodel: replace plumbing, electrical fixtures, tiles: kitchen remodel: replace kitchen cabinets, plumbing, and electrical fixtures. install room lights in bedrooms and livingroom. no layout change. replace in kind, no structural | $72,000 |
| Nov 12, 2021 | Completed final sign-off Feb 2022 | 2855 Pierce St | unit 10: remodel one kitchen and one bathroom. no wall alteration. interior painting.Details
unit 10: remodel one kitchen and one bathroom. no wall alteration. interior painting. | $28,000 |
| Nov 2, 2021 | Completed final sign-off Aug 2022 | 68 Dellbrook Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $22,000 |
| Oct 25, 2021 | Completed final sign-off Apr 2022 | 350 Cumberland St | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $16,800 |
| Sep 7, 2021 | Completed final sign-off Apr 2022 | 3526 Divisadero St | bathroom remodel: remodel master bathroom with new plumbing fixtures. convert full bath in hallway to 1 and 1/2 bath.Details
bathroom remodel: remodel master bathroom with new plumbing fixtures. convert full bath in hallway to 1 and 1/2 bath. | $40,000 |
| Aug 10, 2021 | Completed final sign-off Jun 2022 | 1817 California St | 1/f, unit 105: remodel (e) kitchen and bathroom, new washer and dryer, remove non bearing walls, new light fixture and outlets, and new electrical baseboard heaters.Details
1/f, unit 105: remodel (e) kitchen and bathroom, new washer and dryer, remove non bearing walls, new light fixture and outlets, and new electrical baseboard heaters. | $40,000 |
| Aug 4, 2021 | Completed final sign-off Aug 2021 | 421 21st Av | revise permit 2021-0716-4535; remove scope "convert bathroom to master bath" keep comply to complaint 202035031 & 202038981Details
revise permit 2021-0716-4535; remove scope "convert bathroom to master bath" keep comply to complaint 202035031 & 202038981 | |
| Aug 2, 2021 | Completed final sign-off Apr 2022 | 3526 Divisadero St | unit #a: kitchen & bathroom remodel in-kind. replace plumbing fixtures, electrical fixtures, cabinets, flooring & interior paint. lights per cenc 150.0(k)Details
unit #a: kitchen & bathroom remodel in-kind. replace plumbing fixtures, electrical fixtures, cabinets, flooring & interior paint. lights per cenc 150.0(k) | $40,000 |
| Jul 16, 2021 | Completed final sign-off Aug 2021 | 421 21st Av | convert 1 hall bathroom into master bathroom, removal of 1 window compiance with nov 202035031Details
convert 1 hall bathroom into master bathroom, removal of 1 window compiance with nov 202035031 | $8,000 |
| Jun 25, 2021 | Completed final sign-off Jun 2022 | 87 Virgil St | unit #3: remodel (e) kitchen, replace counter, cabinets. construct new bathroom. install washer/dryer. all work 2nd floor.Details
unit #3: remodel (e) kitchen, replace counter, cabinets. construct new bathroom. install washer/dryer. all work 2nd floor. | $25,000 |
| Jun 18, 2021 | Completed final sign-off May 2025 | 2614 Sacramento St | construct new bathroom, remove/relocate (e) full bath, replace (e) sheetrock w/ new at g/f. remodel (e) kitchen, (e) powder room, replace (e) sheetrock w/ new at 2nd floor. upgrade (e) berooms, relocate 2 (e) bathroom, add (n) bathroom, replace sheetrock w/ new at 3rd floor.Details
construct new bathroom, remove/relocate (e) full bath, replace (e) sheetrock w/ new at g/f. remodel (e) kitchen, (e) powder room, replace (e) sheetrock w/ new at 2nd floor. upgrade (e) berooms, relocate 2 (e) bathroom, add (n) bathroom, replace sheetrock w/ new at 3rd floor. | $150,000 |
| May 24, 2021 | Completed final sign-off Sep 2021 | 2855 Pierce St | apt 9: remodel kitchen & bathroom. replace fixtures. no wall modfication.Details
apt 9: remodel kitchen & bathroom. replace fixtures. no wall modfication. | $30,000 |
| Apr 20, 2021 | Expired or cancelled cancelled Feb 2025 | 99 Castenada Av | add 2nd story, expand (e) partial basement, rebuild the rear retaining wall, and landscape front & rear yards. the new residence will include living room, fam room, dining room, three bedrooms, three full bathrooms, powder room, laundry room and storage spaces. full permit.Details
add 2nd story, expand (e) partial basement, rebuild the rear retaining wall, and landscape front & rear yards. the new residence will include living room, fam room, dining room, three bedrooms, three full bathrooms, powder room, laundry room and storage spaces. full permit. | $650,000 |
| Mar 22, 2021 | Completed final sign-off Jun 2021 | 2969 Jackson St | unit 404 - remodel 1 kitchen and 1 bathroom in-kind. no walls change. retile floor amd wall & interior painting. replace kitchen cabinet and counter top. comply w/ 202174164Details
unit 404 - remodel 1 kitchen and 1 bathroom in-kind. no walls change. retile floor amd wall & interior painting. replace kitchen cabinet and counter top. comply w/ 202174164 | $19,000 |
| Feb 26, 2021 | Completed final sign-off Sep 2021 | 88 King St | two bathrooms remodel: replace plumbing fixtures, tiles, upgrade electrical and interior painting. no sprinkler work.Details
two bathrooms remodel: replace plumbing fixtures, tiles, upgrade electrical and interior painting. no sprinkler work. | $30,000 |
| Dec 1, 2020 | Never finaled issued Jan 2021, no final | 2572 California St | remodel (e) kitchen, bathroom. for unit #2, in-fill one hour wall between two unit. all work on 2nd floor.Details
remodel (e) kitchen, bathroom. for unit #2, in-fill one hour wall between two unit. all work on 2nd floor. | $32,000 |
| Nov 20, 2020 | Completed final sign-off Jul 2021 | 2001 California St | #207: kitchen and bathroom remodel. update electrical. new flooring. interior painting. no layout changes.Details
#207: kitchen and bathroom remodel. update electrical. new flooring. interior painting. no layout changes. | $40,000 |
| Nov 4, 2020 | Completed final sign-off Oct 2021 | 478 La Grande Av | construct one bedroom, one play room, one full bath, & one media room at ground floor.Details
construct one bedroom, one play room, one full bath, & one media room at ground floor. | $82,000 |
| Oct 13, 2020 | Completed final sign-off Dec 2021 | 326 Santiago St | construct 1 media room & 1 full bath on ground floor. remodel (e) kitchen & bathroom. construct 1 new full bath on 2nd floor.Details
construct 1 media room & 1 full bath on ground floor. remodel (e) kitchen & bathroom. construct 1 new full bath on 2nd floor. | $82,000 |
| Aug 27, 2020 | Completed final sign-off Nov 2020 | 674 Haight St | unit #4 - kithcen and bathroom remodel, no layut change compliance with complaint #202050725 & his 202048813Details
unit #4 - kithcen and bathroom remodel, no layut change compliance with complaint #202050725 & his 202048813 | $22,000 |
| Aug 27, 2020 | Never finaled issued Aug 2020, no final | 2572 California St | unit 1: kitchen and bathroom remodel upgrade, electrical in the unit, painting. unit 2: upgrade electrical in the unit, painting and flooringDetails
unit 1: kitchen and bathroom remodel upgrade, electrical in the unit, painting. unit 2: upgrade electrical in the unit, painting and flooring | $45,000 |
| Jul 14, 2020 | Completed final sign-off May 2021 | 407 Greenwich St | kitchen (110 sq ft) and bathroom (35 sq ft) remodel. replace kitchen cabinets, flooring, plumbing fixtures and electrical fixtures. no bearing walls removed. replace bathroom plumbing fixtures and electrical fixtures and flooring.Details
kitchen (110 sq ft) and bathroom (35 sq ft) remodel. replace kitchen cabinets, flooring, plumbing fixtures and electrical fixtures. no bearing walls removed. replace bathroom plumbing fixtures and electrical fixtures and flooring. | $35,000 |
| Jul 2, 2020 | Completed final sign-off Dec 2021 | 399 London St | 399 london: 1) remodel (e) kitchen, replace counter, cabinets, sink & repair (e) interior stair at ground flr. 2) add one full bath at 3rd flr. 105 persia: 1) add powder room at 2nd floor.Details
399 london: 1) remodel (e) kitchen, replace counter, cabinets, sink & repair (e) interior stair at ground flr. 2) add one full bath at 3rd flr. 105 persia: 1) add powder room at 2nd floor. | $62,000 |
| Jun 15, 2020 | Never finaled issued Jul 2020, no final | 88 King St | bathroom remodel: replace toilet, vanity, floor tile and shower fixtures with similar in kind. replace bathtub with shower pan. no floor plan change.Details
bathroom remodel: replace toilet, vanity, floor tile and shower fixtures with similar in kind. replace bathtub with shower pan. no floor plan change. | $20,000 |
| Jun 12, 2020 | Completed final sign-off Mar 2021 | 2572 California St | unit #4: remodel kitchen and bathroom in kindDetails
unit #4: remodel kitchen and bathroom in kind | $30,000 |
| Feb 26, 2020 | Never finaled issued Feb 2020, no final | 88 King St | #723: bathroom remodel - replace plumbing fixtures, tile floor, vanity, new paint.Details
#723: bathroom remodel - replace plumbing fixtures, tile floor, vanity, new paint. | $18,000 |
| Dec 4, 2019 | Completed final sign-off Jul 2020 | 40 Lunado Wy | convert existing dining room to 2 bedroom. convert laundry room to 1 full bathroom. all work on 2nd floorDetails
convert existing dining room to 2 bedroom. convert laundry room to 1 full bathroom. all work on 2nd floor | $20,000 |
| Oct 18, 2019 | Completed final sign-off Mar 2021 | 263 29th Av | kitchen remodel, 150 sq ft--replace flooringm cabinets and countertops, plumbing fixtures, painting. bathroom remodel, 80 sq ft -- replace shower stall, vanity 1/2 bath remodel, 15 sq ft---replace toilet, vanity, tiles, and toiletDetails
kitchen remodel, 150 sq ft--replace flooringm cabinets and countertops, plumbing fixtures, painting. bathroom remodel, 80 sq ft -- replace shower stall, vanity 1/2 bath remodel, 15 sq ft---replace toilet, vanity, tiles, and toilet | $60,000 |
| Oct 10, 2019 | Completed final sign-off Jun 2020 | 32 Jansen St | revision to app#201810183531. delete bath room. replace extg window in kind on mezzanine floor.Details
revision to app#201810183531. delete bath room. replace extg window in kind on mezzanine floor. | $1,000 |
| Sep 3, 2019 | Never finaled issued Sep 2019, no final | 479 Mangels Av | kitchen & bathroom remodel - replace kitchen cabinets, countertop, plumbing fixtures, flooring. electrical upgrade. bathroom - replace flooring, plumbing fixtures & new shower stall. no structural work. remodel in kind. comply with cec 150.0(k)3 & 150.0(k)5.Details
kitchen & bathroom remodel - replace kitchen cabinets, countertop, plumbing fixtures, flooring. electrical upgrade. bathroom - replace flooring, plumbing fixtures & new shower stall. no structural work. remodel in kind. comply with cec 150.0(k)3 & 150.0(k)5. | $30,000 |
| Sep 3, 2019 | Completed final sign-off Jun 2020 | 216 Bridgeview Dr | construct 2 bedrm, 2 full baths @ ground fl; remodel (e) kitchen, bathrm @ 2nd fl; upgrade (e) open space to family room @ bastement level; re-built (e) interior staircase from ground fl down to basementDetails
construct 2 bedrm, 2 full baths @ ground fl; remodel (e) kitchen, bathrm @ 2nd fl; upgrade (e) open space to family room @ bastement level; re-built (e) interior staircase from ground fl down to basement | $115,000 |
| Aug 22, 2019 | Completed final sign-off Jun 2020 | 32 Jansen St | comply w/complaint 201973461 & 201977713 revision under pa 2018-1018-3531 & 2019-0808-8274. relocate bathroom to south side. all work at (e) study room on roofDetails
comply w/complaint 201973461 & 201977713 revision under pa 2018-1018-3531 & 2019-0808-8274. relocate bathroom to south side. all work at (e) study room on roof | $200 |
| Jul 25, 2019 | Completed final sign-off Jun 2020 | 207 Gough St | unit 54 - interior remodel - add new wall to make 1 additional den & remodel (e) kitchen/bathroom in kind. replace all new fixtures, counter, flooringDetails
unit 54 - interior remodel - add new wall to make 1 additional den & remodel (e) kitchen/bathroom in kind. replace all new fixtures, counter, flooring | $20,000 |
| Jul 25, 2019 | Completed final sign-off Jun 2020 | 207 Gough St | unit 43 - interior remodel - add new wall to make 1 additional den & remodel (e) kitchen/bathroom in kind. replace all new fixtures, counter, flooringDetails
unit 43 - interior remodel - add new wall to make 1 additional den & remodel (e) kitchen/bathroom in kind. replace all new fixtures, counter, flooring | $20,000 |
| Jun 13, 2019 | Never finaled issued Jun 2019, no final | 1286 45th Av | to comply with compliant #201956541. repair dryrot in bedroom 50 sq ft. repair bathroom drywall 40 sq ft. install bathroom fan terminal on the roof and 3 ft away from property line and opening.Details
to comply with compliant #201956541. repair dryrot in bedroom 50 sq ft. repair bathroom drywall 40 sq ft. install bathroom fan terminal on the roof and 3 ft away from property line and opening. | $2,200 |
| Jun 13, 2019 | Never finaled issued Jul 2019, no final | 88 King St | 12th fl: remove 1 (e) bathroom, convert to closet at unit #1218. remove 1 (e) closet, convert to wet bar & relocate (e) kitchen range at unit #1218.Details
12th fl: remove 1 (e) bathroom, convert to closet at unit #1218. remove 1 (e) closet, convert to wet bar & relocate (e) kitchen range at unit #1218. | $8,000 |
| Jun 4, 2019 | Completed final sign-off Aug 2019 | 459 Marietta Dr | construct 1 bedroom, 1 full bathroom @ ground floor; remodel (e) kitchen & 2 bathroom @ 2nd floorDetails
construct 1 bedroom, 1 full bathroom @ ground floor; remodel (e) kitchen & 2 bathroom @ 2nd floor | $50,000 |
| May 24, 2019 | Completed final sign-off Jan 2021 | 1911 Hayes St | barrier removal. bathroom ada. ada entry push pad.Details
barrier removal. bathroom ada. ada entry push pad. | $20,000 |
| Apr 11, 2019 | Completed final sign-off Feb 2020 | 1920 Ocean Av | unit 1d: kitchen remodel (150 sq. ft.), replace cabinets, countertop, flooring, plumbing & electrical fixtures, bathroom remodel (50 sq. ft.), replace plubming & electrical fixtures, replace flooring trim in the unit along w/iterim painting.Details
unit 1d: kitchen remodel (150 sq. ft.), replace cabinets, countertop, flooring, plumbing & electrical fixtures, bathroom remodel (50 sq. ft.), replace plubming & electrical fixtures, replace flooring trim in the unit along w/iterim painting. | $32,000 |
| Feb 19, 2019 | Completed final sign-off Apr 2019 | 1120 Lake St | upgrade (e) two bedroom, 1 full bath room & media room @ ground floorDetails
upgrade (e) two bedroom, 1 full bath room & media room @ ground floor | $56,000 |
| Jan 28, 2019 | Completed final sign-off May 2019 | 157 Westwood Dr | repair water damagedin bathroom walls retile walls. reinstall plumbing fixtures. replace hardwood floor in hallway interim painting.Details
repair water damagedin bathroom walls retile walls. reinstall plumbing fixtures. replace hardwood floor in hallway interim painting. | $5,000 |
| Oct 18, 2018 | Completed final sign-off Jun 2020 | 32 Jansen St | remove/replace (e) sheetrock w/new. install new insulation , add new full bathroom & replace new siding, all work at (e) study room on roof level/mezzanine.Details
remove/replace (e) sheetrock w/new. install new insulation , add new full bathroom & replace new siding, all work at (e) study room on roof level/mezzanine. | $21,000 |
| Sep 26, 2018 | Completed final sign-off Jun 2019 | 2190 Broadway | unit 9 e. remodel 1 kitchen and 3 full bathrooms & 1/2 bathroom. replace flooring, plumbing and electrical fixture throughout remodel as needed.Details
unit 9 e. remodel 1 kitchen and 3 full bathrooms & 1/2 bathroom. replace flooring, plumbing and electrical fixture throughout remodel as needed. | $55,000 |
| Jun 27, 2018 | Completed final sign-off Jun 2019 | 130 Paraiso Pl | kitchen and bathroom remodel. additional bathroom 7'x10'. existing bath 5'x10'. kitchen 21'x16'-7Details
kitchen and bathroom remodel. additional bathroom 7'x10'. existing bath 5'x10'. kitchen 21'x16'-7 | $48,000 |
| May 8, 2018 | Expired or cancelled cancelled Feb 2025 | 22 West View Av | comply w/ complant# 201632091/201626494/201776192. unit addition per adu ord# 95-17, legalization of unit installed w/o permit. legalize kitchen , bed rm, family rm and bath rm @ ground fl. new deck at rear of building.Details
comply w/ complant# 201632091/201626494/201776192. unit addition per adu ord# 95-17, legalization of unit installed w/o permit. legalize kitchen , bed rm, family rm and bath rm @ ground fl. new deck at rear of building. | $42,000 |
| May 8, 2018 | Completed final sign-off Oct 2018 | 54 Howth St | construct 2 bed rooms, 2 full bath rooms. all work at ground floor.Details
construct 2 bed rooms, 2 full bath rooms. all work at ground floor. | $48,000 |