Block 0832, lot 004
207 Gough St
- City’s use
- Multi-Family Residential
- Built
- 1926
- Stories
- 4
- Units
- 37
- Rooms
- 37 bathrooms
- Building
- 25,480 sq ft
- Lot
- 7,697 sq ft
- Zoning
- HAYES
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
22 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 18, 2025 | Completed final sign-off Mar 2025 | 207 Gough St | Chaney Construction | replace damage decking and stair threads on rear stairs approx 10%. repair any dry rot where neccesary. to comply with nov #2025-33132 #4.Details
replace damage decking and stair threads on rear stairs approx 10%. repair any dry rot where neccesary. to comply with nov #2025-33132 #4. | $3,000 |
| Apr 12, 2024 | Completed final sign-off Nov 2024 | 207 Gough St | K A Lau Construction | unit 42: kitchen and bathroom remodel. electrical upgrade in the unitDetails
unit 42: kitchen and bathroom remodel. electrical upgrade in the unit | $50,000 |
| Mar 30, 2023 | Completed final sign-off Dec 2023 | 207 Gough St | K A Lau Construction | unit 36: kitchen remodel, bathroom remodel: update electrical: no structural changeDetails
unit 36: kitchen remodel, bathroom remodel: update electrical: no structural change | $50,000 |
| Jun 23, 2022 | Completed final sign-off Mar 2023 | 207 Gough St | K A Lau Construction | unit 28 - interior remodel: remodel kitchen/bath; replace/add new fixtures, counters & flooring; (n) lighting, fans, outlets and switchesDetails
unit 28 - interior remodel: remodel kitchen/bath; replace/add new fixtures, counters & flooring; (n) lighting, fans, outlets and switches | $36,000 |
| May 12, 2022 | Never finaled issued May 2022, no final | 207 Gough St | Fidelity Roof Company | reroofingDetails
reroofing | $105,490 |
| Jul 19, 2021 | Completed final sign-off Sep 2021 | 201 Gough St | Buhler Construction | in accordance with abe (51-16). install power door operator.Details
in accordance with abe (51-16). install power door operator. | $5,000 |
| May 6, 2021 | Completed final sign-off Apr 2022 | 207 Gough St | Commercial Fire Protection Inc | install low frequency sounders to meet 75 db at the pillow per sffc section 1103.7.6.1 and replace fire alarm & existing devices.Details
install low frequency sounders to meet 75 db at the pillow per sffc section 1103.7.6.1 and replace fire alarm & existing devices. | $82,600 |
| Jul 25, 2019 | Completed final sign-off Jun 2020 | 207 Gough St | K A Lau Construction | unit 43 - interior remodel - add new wall to make 1 additional den & remodel (e) kitchen/bathroom in kind. replace all new fixtures, counter, flooringDetails
unit 43 - interior remodel - add new wall to make 1 additional den & remodel (e) kitchen/bathroom in kind. replace all new fixtures, counter, flooring | $20,000 |
| Jul 25, 2019 | Completed final sign-off Jun 2020 | 207 Gough St | K A Lau Construction | unit 54 - interior remodel - add new wall to make 1 additional den & remodel (e) kitchen/bathroom in kind. replace all new fixtures, counter, flooringDetails
unit 54 - interior remodel - add new wall to make 1 additional den & remodel (e) kitchen/bathroom in kind. replace all new fixtures, counter, flooring | $20,000 |
| Nov 23, 2015 | Completed final sign-off Apr 2016 | 207 Gough St | K A Lau Construction | unit # 51: kitchen and bathroom remodel onlyDetails
unit # 51: kitchen and bathroom remodel only | $25,000 |
| Sep 18, 2015 | Completed final sign-off Jun 2016 | 207 Gough St | K A Lau Construction | work in unit #22: interior remodel 1 1 bedroom apartment. remodel bath with new fixtures and finishes. relocate e kitchen. add new walls to make 1 additional bedroom. elec/plumb work inside aptDetails
work in unit #22: interior remodel 1 1 bedroom apartment. remodel bath with new fixtures and finishes. relocate e kitchen. add new walls to make 1 additional bedroom. elec/plumb work inside apt | $45,000 |
| Oct 22, 2014 | Completed final sign-off Mar 2015 | 207 Gough St | K A Lau Construction | #45:interior painting with electrical upgrade. kitchen remodel-replace floor tile, cabinet, countertop & plumbing fixtures. bathroom remodel- replace tile floor, vanity & plumbing fixtures. no new wall&no existing wall relocation. kitchen & bathroom remodel shall comply with cec 150(k)3&cec 150(k)5.Details
#45:interior painting with electrical upgrade. kitchen remodel-replace floor tile, cabinet, countertop & plumbing fixtures. bathroom remodel- replace tile floor, vanity & plumbing fixtures. no new wall&no existing wall relocation. kitchen & bathroom remodel shall comply with cec 150(k)3&cec 150(k)5. | $25,000 |
| Sep 5, 2014 | Completed final sign-off Mar 2015 | 207 Gough St | K A Lau Construction | apt #33. kitchen remodel: replace tile floor, cabinet, counter top, plumbing fixtures. bathroom remodel: replace tile floor, vanity & plumbing fixtures. interior painting with electrical upgrade.Details
apt #33. kitchen remodel: replace tile floor, cabinet, counter top, plumbing fixtures. bathroom remodel: replace tile floor, vanity & plumbing fixtures. interior painting with electrical upgrade. | $25,000 |
| Jun 13, 2014 | Completed final sign-off Oct 2014 | 207 Gough St | K A Lau Construction | unit 26: kitchen & bathroom remodel, replace cabinet, counter tops, fixtures, replace toilet & vanity, upgrade electrical, no structural wall removal, lighting to comly with cec 150(k), no windows & no doors on this permit.Details
unit 26: kitchen & bathroom remodel, replace cabinet, counter tops, fixtures, replace toilet & vanity, upgrade electrical, no structural wall removal, lighting to comly with cec 150(k), no windows & no doors on this permit. | $28,000 |
| Feb 24, 2014 | Completed final sign-off Jul 2014 | 207 Gough St | K A Lau Construction | unit 25: kitchen remodel, replace cabinet, counter top; bathroom remodel, replace sink, shower; electrical upgrade, add lights will be high efficacy. no structural work.Details
unit 25: kitchen remodel, replace cabinet, counter top; bathroom remodel, replace sink, shower; electrical upgrade, add lights will be high efficacy. no structural work. | $29,000 |
| Jan 2, 2014 | Never finaled issued Jan 2014, no final | 207 Gough St | street space permitDetails
street space permit | ||
| Dec 24, 2013 | Never finaled issued Dec 2013, no final | 207 Gough St | Architectural Fenestration & Restoration | window replacement - (e) double hung window (150) on east, wouth, west facades with same like and type pella architect series windows - 2 street sides visible and grids to match (e) exactly. u-factor not more than .4Details
window replacement - (e) double hung window (150) on east, wouth, west facades with same like and type pella architect series windows - 2 street sides visible and grids to match (e) exactly. u-factor not more than .4 | $125,500 |
| Nov 8, 2013 | Never finaled issued Nov 2013, no final | 207 Gough St | street space permitDetails
street space permit | ||
| Jan 14, 2013 | Completed final sign-off Apr 2013 | 207 Gough St | Paramount Construction Services Inc | replace kitchen cabinets & countertops. replace vanity cabinets, sink, faucet, replace kitchen sink & faucet. relocated sub-panel & upgrade. change outlets, switches & lighting, 50% of lights in kind will be high efficacyDetails
replace kitchen cabinets & countertops. replace vanity cabinets, sink, faucet, replace kitchen sink & faucet. relocated sub-panel & upgrade. change outlets, switches & lighting, 50% of lights in kind will be high efficacy | $8,000 |
| Jan 30, 2012 | Never finaled issued Jan 2012, no final | 207 Gough St | street space permitDetails
street space permit | ||
| Mar 11, 2009 | Completed final sign-off Mar 2009 | 207 Gough St | Intergrated Contractors | comply with nov# 200994110 (1 to 5 & 7 & 8). patch holes in garage ceiling, repair window glazing. repair damage floor at exit landing. install garage door rent, door closer on exit doors.Details
comply with nov# 200994110 (1 to 5 & 7 & 8). patch holes in garage ceiling, repair window glazing. repair damage floor at exit landing. install garage door rent, door closer on exit doors. | $2,500 |
| Nov 19, 2008 | Completed final sign-off Jan 2009 | 207 Gough St | On-Site Maintenance | work @ unit# 41 only. remodel 1 kitchen & 1 partial bathroom. upgrade kitchen & bath. no structural cabinets, counter. (new fixtures for bath).Details
work @ unit# 41 only. remodel 1 kitchen & 1 partial bathroom. upgrade kitchen & bath. no structural cabinets, counter. (new fixtures for bath). | $25,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.