Back to kitchen remodel contractors
Jun Meng Li
- Based in
- San Francisco
- On San Francisco permits
- Dec 2003 to Mar 2026
- Last 24 months
- 1 permit filed
25 permits since 2000: 23 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 10 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 186 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 12, 2022 | Completed final sign-off Sep 2023 | 165 San Anselmo Av | remodeling kitchen, remodeling 4 and half bathrooms, removing and repairing dry rot damange on the left side of the house.Details
remodeling kitchen, remodeling 4 and half bathrooms, removing and repairing dry rot damange on the left side of the house. | $75,000 |
| Sep 13, 2019 | Completed final sign-off Feb 2020 | 2401 45th Av | unit 3 - remodel 1 kitchen and 1 bathroomDetails
unit 3 - remodel 1 kitchen and 1 bathroom | $20,000 |
| Jan 27, 2017 | Completed final sign-off Jul 2018 | 20 Dartmouth St | addition of dwelling units per ordinance no #95-17. add 2 bedrooms. 2 full baths, dining, laundry & kitchen @ 1st floor per plan.Details
addition of dwelling units per ordinance no #95-17. add 2 bedrooms. 2 full baths, dining, laundry & kitchen @ 1st floor per plan. | $57,600 |
| Sep 30, 2016 | Completed final sign-off Apr 2017 | 188 Nueva Av | replace (e) kitchen at 2nd floor. like for like. no change to wall locations.Details
replace (e) kitchen at 2nd floor. like for like. no change to wall locations. | $20,000 |
| Sep 30, 2014 | Completed final sign-off Dec 2014 | 2077 Fulton St | remodel (e) kitchen at top floor; no change in layout, lighting to comply with cec 150(k)Details
remodel (e) kitchen at top floor; no change in layout, lighting to comply with cec 150(k) | $8,000 |
| Jul 29, 2014 | Completed final sign-off Jun 2020 | 1931 09th Av | 1st floor add 1 full bathroom, 1 bedroom & one family room. 2nd floor remodel kitchen & bathroom, build new rear deck.Details
1st floor add 1 full bathroom, 1 bedroom & one family room. 2nd floor remodel kitchen & bathroom, build new rear deck. | $100,000 |
| Sep 23, 2013 | Completed final sign-off Jan 2014 | 198 Nueva Av | replace existing kitchen at 2nd flrDetails
replace existing kitchen at 2nd flr | $8,000 |
| Sep 26, 2011 | Completed final sign-off Mar 2012 | 2817 Pacheco St | existing kitchen and bathroom remodel. no structural work. new lighting comply w/ cec 150(k).Details
existing kitchen and bathroom remodel. no structural work. new lighting comply w/ cec 150(k). | $20,000 |
| Nov 30, 2009 | Completed final sign-off Sep 2010 | 327 College Av | kitchen remodel, remove & replace cabinets & appliances,plumbing fixtures, move stove, new hood, ventilator, add light to 1 cabinet, new counter tops, add low voltage decorative light to code.Details
kitchen remodel, remove & replace cabinets & appliances,plumbing fixtures, move stove, new hood, ventilator, add light to 1 cabinet, new counter tops, add low voltage decorative light to code. | $25,000 |
| Jun 30, 2009 | Expired or cancelled expired Jun 2013 | 1778 La Salle Av | comply w/compliant #200910782 - remodel bathroom: change bathtub, tile, vanity & remodel kitchen: change cabinet, tile on the floor & appliance.Details
comply w/compliant #200910782 - remodel bathroom: change bathtub, tile, vanity & remodel kitchen: change cabinet, tile on the floor & appliance. | $6,000 |
| Jan 14, 2008 | Completed final sign-off Apr 2008 | 730 09th Av | remodel (1) bathroom & (1) kitchen. no structural work. 50% of wattage of kitchen lighting to be fluorescent. bathroom lighting to be fluorescant or on occupant sensor.Details
remodel (1) bathroom & (1) kitchen. no structural work. 50% of wattage of kitchen lighting to be fluorescent. bathroom lighting to be fluorescant or on occupant sensor. | $12,000 |