Jtm Developments
- Based in
- San Francisco
- On San Francisco permits
- Jun 2011 to Jan 2026
- Last 24 months
- 4 permits filed
17 permits since 2000: 10 completed, 2 in progress, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 26 days from filing to permit and 326 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 2, 2025 | Completed final sign-off Nov 2025 | 1751 Fulton St | change of occupancy from a-3 to b. non weight bearing wall with door and window and change stairs entry. relocated drinking fountain.Details
change of occupancy from a-3 to b. non weight bearing wall with door and window and change stairs entry. relocated drinking fountain. | $12,000 |
| Jan 23, 2020 | Completed final sign-off Feb 2022 | 2140 09th Av | replacement in concrete of extg entry stair wood framing due to rot.Details
replacement in concrete of extg entry stair wood framing due to rot. | $20,000 |
| Aug 23, 2018 | Completed final sign-off Jul 2026 | 1025 Sanchez St | legalize reconfigured rear deck(s), egress stair to rear yard and rear facade alterationsDetails
legalize reconfigured rear deck(s), egress stair to rear yard and rear facade alterations | $22,000 |