Back to kitchen remodel contractors
Joto Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2001 to Sep 2011
- Last 24 months
- 0 permits filed
9 permits since 2000: 7 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 220 days from filing to permit and 412 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2009 | Completed final sign-off Mar 2012 | 2021 16th Av | alterations to interior and to front porch and add a new rear deck. new roof to be constructed. convert (e) flat roof to (n) pitched roof. interior work includes remodelling of kitchen, bathroom, bedrooms and interior stair relocation.Details
alterations to interior and to front porch and add a new rear deck. new roof to be constructed. convert (e) flat roof to (n) pitched roof. interior work includes remodelling of kitchen, bathroom, bedrooms and interior stair relocation. | $180,000 |
| Dec 14, 2001 | Completed final sign-off Aug 2002 | 538 Valencia St | remodel kitchen & dining area, new accessible unisex toilet,new entry rampDetails
remodel kitchen & dining area, new accessible unisex toilet,new entry ramp | $54,000 |