Back to kitchen remodel contractors
Joselito S Soliman
- Based in
- South San Francisco
- On San Francisco permits
- Aug 2013 to Mar 2023
- Last 24 months
- 0 permits filed
3 permits since 2000: 1 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 expired or cancelled. Typically 10 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 21, 2023 | Expired or cancelled expired Sep 2026 | 615 Brussels St | to comply with planning 2023-001551enf & dbi 202303625. remove and replace bathroom & kitchen fixtures in kind. window replacement within exisitng openings (3 windows at front facade) with wood clad windowsDetails
to comply with planning 2023-001551enf & dbi 202303625. remove and replace bathroom & kitchen fixtures in kind. window replacement within exisitng openings (3 windows at front facade) with wood clad windows | $12,000 |