Back to kitchen remodel contractors
Jolo Construction(See Note)
- Based in
- Fairfield
- On San Francisco permits
- Sep 2010 to Oct 2020
- Last 24 months
- 0 permits filed
11 permits since 2000: 9 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 7 completed, 1 never finaled. Typically 0 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 23, 2020 | Completed final sign-off Feb 2021 | 220 Monterey Bl | replacing kitchen cabinet & sinkDetails
replacing kitchen cabinet & sink | $8,000 |
| May 22, 2019 | Completed final sign-off Jan 2023 | 25 Junipero Serra Bl | kitchen remodel, bathroom remodel and enclosure of (e) open area of 164 sqftDetails
kitchen remodel, bathroom remodel and enclosure of (e) open area of 164 sqft | $100,000 |
| Mar 17, 2017 | Completed final sign-off Jun 2017 | 295 Yerba Buena Av | kitchen remodel - replace cabinets only in same location.Details
kitchen remodel - replace cabinets only in same location. | $10,000 |
| Mar 4, 2016 | Completed final sign-off Jul 2017 | 149 Laidley St | kitchen remodel. recess lighting, new duct work, new cabinets and island install. no structural work.Details
kitchen remodel. recess lighting, new duct work, new cabinets and island install. no structural work. | $20,000 |
| Jan 14, 2016 | Never finaled issued Jan 2016, no final | 1488 Harrison St | unit 101: kitchen remodeling - replaceing cabinets.Details
unit 101: kitchen remodeling - replaceing cabinets. | $15,000 |
| Sep 3, 2015 | Completed final sign-off Feb 2016 | 1214 Hampshire St | kitchen remodel, cabinet & appliance installation, no walls moved, removed, added or infilled, all existing layouts to remain unchanged.Details
kitchen remodel, cabinet & appliance installation, no walls moved, removed, added or infilled, all existing layouts to remain unchanged. | $19,000 |
| Aug 12, 2015 | Completed final sign-off Dec 2015 | 1680 Lombard St | unit 4: install new kitchen cabinets, upgrade electrical, run gas line.Details
unit 4: install new kitchen cabinets, upgrade electrical, run gas line. | $35,000 |
| Jul 29, 2015 | Completed final sign-off Oct 2015 | 900 Bush St | unit #409: kitchen remodel. electrical, floor, cabinets. replace cabinets and flooring. add breaker and receptacle to upgrade electricalDetails
unit #409: kitchen remodel. electrical, floor, cabinets. replace cabinets and flooring. add breaker and receptacle to upgrade electrical | $24,000 |