61 permits since 2000: 52 completed, 4 in progress, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
5 deck permits: 4 completed, 1 expired or cancelled. Typically 54 days from filing to permit and 163 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 6, 2023 | Completed final sign-off Jul 2023 | 4125 17th St | deck repair. replace rotten post and beam. less than 50%. rear deck - not visible from the street.Details
deck repair. replace rotten post and beam. less than 50%. rear deck - not visible from the street. | $3,000 |
| Mar 22, 2018 | Completed final sign-off Jul 2018 | 1326 11th Av | comply with nov item #1 201780381, 201783091 (1) remove 3rd story sunroom and revert back to approved deck per bldg. pa 200204184333 & remove unpermitted attached deck on 3rd and 2nd floor that extends approx 7' into rear yard in compliance with nov 201780381 and 201318211. permit for electricalDetails
comply with nov item #1 201780381, 201783091 (1) remove 3rd story sunroom and revert back to approved deck per bldg. pa 200204184333 & remove unpermitted attached deck on 3rd and 2nd floor that extends approx 7' into rear yard in compliance with nov 201780381 and 201318211. permit for electrical | $5,000 |
| Mar 16, 2018 | Completed final sign-off Jan 2019 | 1071 Plymouth Av | 1)interior alteration to enlarge extg hall area. add 2 new closet. reconfigure 2 bathroom fixtures and kitchen remodel on 2nd floor per plan. 2)proposed new wooden deck at rear on 2nd floor.Details
1)interior alteration to enlarge extg hall area. add 2 new closet. reconfigure 2 bathroom fixtures and kitchen remodel on 2nd floor per plan. 2)proposed new wooden deck at rear on 2nd floor. | $15,000 |
| Sep 30, 2015 | Expired or cancelled expired Dec 2017 | 126 Lisbon St | repair dry rot on rear deck only; 20%. to comply with complaint #201571131.Details
repair dry rot on rear deck only; 20%. to comply with complaint #201571131. | $1,000 |
| Dec 20, 2007 | Completed final sign-off Apr 2009 | 1719 30th Av | horzontal addition 2 story, at rear, add 2 bedroom, one family room and one bathroom at ground floor. add 2 bedroom one bath at rear deck and stair to back yard.Details
horzontal addition 2 story, at rear, add 2 bedroom, one family room and one bathroom at ground floor. add 2 bedroom one bath at rear deck and stair to back yard. | $150,000 |