Back to bathroom remodel contractors
John Woo Constructionllc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2007 to Aug 2026
- Last 24 months
- 11 permits filed
61 permits since 2000: 52 completed, 4 in progress, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
29 bathroom remodel permits: 26 completed, 2 in progress, 1 expired or cancelled. Typically 10 days from filing to permit and 242 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2026 | In progress issued Aug 2026 | 1739 07th Av | 2 bathrooms and 1 kitchen remodel in kind. replace 5 windows back of bldg, non street facing. no tub to shower conversions. update electrical and plumbing as needed.Details
2 bathrooms and 1 kitchen remodel in kind. replace 5 windows back of bldg, non street facing. no tub to shower conversions. update electrical and plumbing as needed. | $70,000 |
| Apr 8, 2026 | In progress issued Apr 2026 | 148 Idora Av | 2 bathroom in-kind remodel; like fo like. 1 bathroom remodel bathtub to shower pan. replace main meter panel from 100 amps to 200 amps.Details
2 bathroom in-kind remodel; like fo like. 1 bathroom remodel bathtub to shower pan. replace main meter panel from 100 amps to 200 amps. | $85,000 |
| Feb 5, 2026 | Completed final sign-off Apr 2026 | 959 Dolores St | unit 3: bathroom remodel, tub to shower conversion. in kind except new shower in location of existing tub. electrical and plumbing to be updated. replace (e) kitchen hood.Details
unit 3: bathroom remodel, tub to shower conversion. in kind except new shower in location of existing tub. electrical and plumbing to be updated. replace (e) kitchen hood. | $22,000 |
| Aug 19, 2025 | Completed final sign-off Jul 2026 | 259 Dublin St | comply w/ complaint # 202536952 & 202537058: reconfigure rooms & bathroom to code complance. add wetbar on g/f.Details
comply w/ complaint # 202536952 & 202537058: reconfigure rooms & bathroom to code complance. add wetbar on g/f. | $150,000 |
| Sep 20, 2024 | Completed final sign-off Jun 2026 | 2475 23rd Av | lightwell infill on 2nd flr. 26sf addition of habitable space. (n) 1 hr fire rated wall and parapet adjacent to neighboring buildilng. reconfigure interior stairs. replace (e) skylight located at hallway, install (n) 4 skylights located in bathrooms, hallway and stairs, (n) fixtures in (e) lowerDetails
lightwell infill on 2nd flr. 26sf addition of habitable space. (n) 1 hr fire rated wall and parapet adjacent to neighboring buildilng. reconfigure interior stairs. replace (e) skylight located at hallway, install (n) 4 skylights located in bathrooms, hallway and stairs, (n) fixtures in (e) lower | $100,000 |
| Jul 5, 2024 | Completed final sign-off Aug 2025 | 2437 23rd Av | conversion of 305 sf of garage area to a new condition media room. excavation & configuration of ground fl rear to create two bedrooms. remodel 2 (e) bathrooms. new pantry island within (e) kitchen & radiant heating throughoutDetails
conversion of 305 sf of garage area to a new condition media room. excavation & configuration of ground fl rear to create two bedrooms. remodel 2 (e) bathrooms. new pantry island within (e) kitchen & radiant heating throughout | $285,000 |
| Feb 7, 2024 | Expired or cancelled cancelled Apr 2024 | 2146 48th Av | in kind bathroom room. replace tiles, vanity toilet, tub. no moving walls, no layout changes.Details
in kind bathroom room. replace tiles, vanity toilet, tub. no moving walls, no layout changes. | $10,000 |
| Jan 31, 2024 | Completed final sign-off Dec 2024 | 2146 48th Av | add 42sq ft conditioned area; g/f: demo fireplace & chimney, renovate (e)full bath, infill (e)lightwell, convert (e)family rm into (n)bedroom, (n)family rm, (n)mudroom, (n)laundry rm, replace front gate, (e)furnace; 2/f: remove wall & renovate kitchen & living rm, replace in-kind front windows.Details
add 42sq ft conditioned area; g/f: demo fireplace & chimney, renovate (e)full bath, infill (e)lightwell, convert (e)family rm into (n)bedroom, (n)family rm, (n)mudroom, (n)laundry rm, replace front gate, (e)furnace; 2/f: remove wall & renovate kitchen & living rm, replace in-kind front windows. | $20,000 |
| Dec 15, 2023 | Completed final sign-off Mar 2024 | 524 Euclid Av | in-kind bathroom remodel; non-structuralDetails
in-kind bathroom remodel; non-structural | $15,000 |
| Dec 14, 2023 | Completed final sign-off Sep 2024 | 449 43rd Av | remodel kitchen, re-arrange a bathroom, add a full bath on 2md flDetails
remodel kitchen, re-arrange a bathroom, add a full bath on 2md fl | $60,000 |
| Jul 13, 2023 | Completed final sign-off May 2024 | 2377 Bush St | remodel (e) kitchen/dining room, (e) bathrooms, primary bedroom, convert laundry room to study, add new laundry closet, new space conditioning equipmentDetails
remodel (e) kitchen/dining room, (e) bathrooms, primary bedroom, convert laundry room to study, add new laundry closet, new space conditioning equipment | $120,000 |
| Dec 23, 2022 | Completed final sign-off Apr 2023 | 2638 26th Av | (3) bathroom remodel in-kindDetails
(3) bathroom remodel in-kind | $35,000 |
| Nov 17, 2021 | Completed final sign-off May 2023 | 299 South Hill Bl | demo scope issued under permit 202109289379. 1) second flr: remodel (e) bathroom & kitchen; construct (n) bathrm; all new aluminum wood clad windows - like for like. 2) ground flr: construct (n) bathroom & recreation room w/ new sink and two-burner cooktop. relocate furnace & water heater.Details
demo scope issued under permit 202109289379. 1) second flr: remodel (e) bathroom & kitchen; construct (n) bathrm; all new aluminum wood clad windows - like for like. 2) ground flr: construct (n) bathroom & recreation room w/ new sink and two-burner cooktop. relocate furnace & water heater. | $35,000 |
| Nov 9, 2021 | Completed final sign-off Sep 2022 | 1487 34th Av | kitchen and bathroom remodel on upper level. no structuralDetails
kitchen and bathroom remodel on upper level. no structural | $40,000 |
| Oct 6, 2021 | Completed final sign-off Sep 2022 | 1487 34th Av | 1 legalize and remodel ground floor bedroom & full bathroom on ground approx 495 sf; relocate existing laundry; repair dryrot members of (e) balcony on 2nd flr (rear balcony)Details
1 legalize and remodel ground floor bedroom & full bathroom on ground approx 495 sf; relocate existing laundry; repair dryrot members of (e) balcony on 2nd flr (rear balcony) | $15,000 |
| Sep 28, 2021 | Completed final sign-off May 2023 | 299 South Hill Bl | soft demo while drawing are getting done. demo out sheetrock, kitchen, bathrooms, floos. no wall removal but all demo'd sheet rock will be patched and replaced in kind. kitchen and bathroom replace in kind.Details
soft demo while drawing are getting done. demo out sheetrock, kitchen, bathrooms, floos. no wall removal but all demo'd sheet rock will be patched and replaced in kind. kitchen and bathroom replace in kind. | $10,000 |
| Dec 15, 2020 | Completed final sign-off Nov 2021 | 2739 39th Av | construct (n) skylight at 2nd floor with a maximum height of 12" above the roof surface. remodel (e) kitchen & bathroom at 2nd floor. construct (n) bathroom at 2nd floor. ground floor- remodel (e) bathroom, legalize (e) bedroom, construct (n) laundry & family room.Details
construct (n) skylight at 2nd floor with a maximum height of 12" above the roof surface. remodel (e) kitchen & bathroom at 2nd floor. construct (n) bathroom at 2nd floor. ground floor- remodel (e) bathroom, legalize (e) bedroom, construct (n) laundry & family room. | $100,000 |
| Nov 3, 2020 | Completed final sign-off Dec 2021 | 562 39th Av | main house remodeling. relocated 2nd fl kitchen and add a bathroom to (e) dining room.Details
main house remodeling. relocated 2nd fl kitchen and add a bathroom to (e) dining room. | $30,000 |
| Aug 17, 2020 | Completed final sign-off Apr 2021 | 278 Precita Av | bath remodel, fixtures and finishes only. no new framing. demo fixtures, floor, wall tile. build and waterproof shower pan and shower surrounds. new floor, wall, shower tiles use hardie backer as needed. install 32" wall hung vanity and faucet. showr rough in valve trim. floor drain replace vanitDetails
bath remodel, fixtures and finishes only. no new framing. demo fixtures, floor, wall tile. build and waterproof shower pan and shower surrounds. new floor, wall, shower tiles use hardie backer as needed. install 32" wall hung vanity and faucet. showr rough in valve trim. floor drain replace vanit | $10,500 |
| Jun 26, 2020 | Completed final sign-off Sep 2020 | 1 Hoffman Av | remodel kitchen (100 sq ft) & bathroom (40 sq ft) in-kind. no structural workDetails
remodel kitchen (100 sq ft) & bathroom (40 sq ft) in-kind. no structural work | $35,000 |
| Dec 19, 2019 | Completed final sign-off Aug 2021 | 1326 11th Av | corrective measures in compliance w/ nov#201780381. no structural. legalize the following: door opening on ground fl. connecting (e) family rm & side passage way. convert (e) storage on ground fl to (n) media rm. legalize 48x48 dh window in lightwell. demo unpermitted shower. revert back to 1/2 bathDetails
corrective measures in compliance w/ nov#201780381. no structural. legalize the following: door opening on ground fl. connecting (e) family rm & side passage way. convert (e) storage on ground fl to (n) media rm. legalize 48x48 dh window in lightwell. demo unpermitted shower. revert back to 1/2 bath | $1,000 |
| Nov 1, 2018 | Completed final sign-off Dec 2018 | 2033 Pine St | remodel (2) bathrooms in kind (5' x 8' and 5' x 10').Details
remodel (2) bathrooms in kind (5' x 8' and 5' x 10'). | $20,000 |
| Apr 12, 2018 | Completed final sign-off Jan 2019 | 3027 Rivera St | construct 1 new bedroom, 1 new bathroom, at ground flr, remodel (e) kitchen & (e) bathroom at second flrDetails
construct 1 new bedroom, 1 new bathroom, at ground flr, remodel (e) kitchen & (e) bathroom at second flr | $45,000 |
| Mar 16, 2018 | Completed final sign-off Jan 2019 | 1071 Plymouth Av | 1)interior alteration to enlarge extg hall area. add 2 new closet. reconfigure 2 bathroom fixtures and kitchen remodel on 2nd floor per plan. 2)proposed new wooden deck at rear on 2nd floor.Details
1)interior alteration to enlarge extg hall area. add 2 new closet. reconfigure 2 bathroom fixtures and kitchen remodel on 2nd floor per plan. 2)proposed new wooden deck at rear on 2nd floor. | $15,000 |
| Dec 11, 2017 | Completed final sign-off Jun 2018 | 144 Bernard St | bathroom kitchen remodel in kind. replace all lath and plaster with 5/8" gypsum board. install recess lighting.Details
bathroom kitchen remodel in kind. replace all lath and plaster with 5/8" gypsum board. install recess lighting. | $60,000 |
| Oct 5, 2017 | Completed final sign-off Jun 2019 | 635 Castro St | remove bearing wall between kitchen and living room on the 2nd floor unit; aesthetic work to be performed in both bathrooms and kitchenDetails
remove bearing wall between kitchen and living room on the 2nd floor unit; aesthetic work to be performed in both bathrooms and kitchen | $15,000 |
| Jun 21, 2017 | Completed final sign-off Aug 2017 | 3419 Scott St | bathroom remodel in kind, same size, same location, removal of non load bearing wall to connect toilet room to bath area, enclose existing doorway and add recess lighting. n/a ordinance #155-13Details
bathroom remodel in kind, same size, same location, removal of non load bearing wall to connect toilet room to bath area, enclose existing doorway and add recess lighting. n/a ordinance #155-13 | $6,000 |
| Jan 12, 2016 | Completed final sign-off May 2016 | 291 Connecticut St | remove (e) non-structural partitions & (e) bathroom, install 3 (n) treatment rooms and bathroom, no massage.Details
remove (e) non-structural partitions & (e) bathroom, install 3 (n) treatment rooms and bathroom, no massage. | $25,000 |
| Dec 20, 2007 | Completed final sign-off Apr 2009 | 1719 30th Av | horzontal addition 2 story, at rear, add 2 bedroom, one family room and one bathroom at ground floor. add 2 bedroom one bath at rear deck and stair to back yard.Details
horzontal addition 2 story, at rear, add 2 bedroom, one family room and one bathroom at ground floor. add 2 bedroom one bath at rear deck and stair to back yard. | $150,000 |