John Michael Brautovich
- Based in
- Oakland
- On San Francisco permits
- Jun 2000 to Oct 2008
- Last 24 months
- 0 permits filed
17 permits since 2000: 13 completed, 4 never finaled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 never finaled. Typically 0 days from filing to permit and 242 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 21, 2008 | Never finaled issued Oct 2008, no final | 60 Darrell Pl | revision to approved app #200808270125. illiminate one step/adding one step at lower stairs. revert lower stair to non 1 hour wallDetails
revision to approved app #200808270125. illiminate one step/adding one step at lower stairs. revert lower stair to non 1 hour wall | |
| Aug 27, 2008 | Completed final sign-off Nov 2009 | 60 Darrell Pl | exterior stair in kind repalcement plus additional steps to grade, retaining wall replacement.Details
exterior stair in kind repalcement plus additional steps to grade, retaining wall replacement. | $20,200 |
| Sep 25, 2001 | Completed final sign-off Nov 2001 | 150 Gellert Dr | dry rot repair. ext stairs. at rear limited to 50% of stair/platform system. pt or redwood on sym.Details
dry rot repair. ext stairs. at rear limited to 50% of stair/platform system. pt or redwood on sym. | $500 |