Back to bathroom remodel contractors
John Matthew Calvin
- Based in
- Burlingame
- On San Francisco permits
- Jan 2001 to Aug 2017
- Last 24 months
- 0 permits filed
14 permits since 2000: 13 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 9 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2017 | Completed final sign-off Apr 2018 | 218 Moultrie St | 1st fl: remodel e kitchen bath in kind. remodel bdrm closets. 2nd fl replace guardrail a e office loft with code compliant pony wall. infill e wall opening at office 2. update plumb,elec, lighting. 1st fl relocate cased opening btwn kitchen and lving rmDetails
1st fl: remodel e kitchen bath in kind. remodel bdrm closets. 2nd fl replace guardrail a e office loft with code compliant pony wall. infill e wall opening at office 2. update plumb,elec, lighting. 1st fl relocate cased opening btwn kitchen and lving rm | $120,000 |
| Mar 20, 2007 | Completed final sign-off Aug 2007 | 224 07th Av | bath remodel. no structural. tub, tile and fixture replacement. new wall board. provide flourescent lights or occupacy sensor in bathDetails
bath remodel. no structural. tub, tile and fixture replacement. new wall board. provide flourescent lights or occupacy sensor in bath | $15,000 |
| Dec 11, 2006 | Completed final sign-off May 2007 | 1839 15th St | revise building permit #2006//11/21/8195 to include radiant heat system under tile floor in master bathroom with thermostatDetails
revise building permit #2006//11/21/8195 to include radiant heat system under tile floor in master bathroom with thermostat | $300 |
| Nov 21, 2006 | Completed final sign-off May 2007 | 1839 15th St | master bathroom: swap locations of sink and tub. install new spa tub with shower,relocate doorway, replace main light with fluorescent,add 4 electrical outlets (gfci) and 6 light fixtures, install wall tile and floor tile. master bedroom:add 3 electrical outlets (+afic) and 1 overhead light fixturesDetails
master bathroom: swap locations of sink and tub. install new spa tub with shower,relocate doorway, replace main light with fluorescent,add 4 electrical outlets (gfci) and 6 light fixtures, install wall tile and floor tile. master bedroom:add 3 electrical outlets (+afic) and 1 overhead light fixtures | $38,000 |
| Jun 10, 2004 | Completed final sign-off Nov 2004 | 179 Farnum St | bathroom remodel-new tile and fixtures. shower, toilet, vanity & sink. new tile in shower and floor.Details
bathroom remodel-new tile and fixtures. shower, toilet, vanity & sink. new tile in shower and floor. | $8,000 |
| Aug 13, 2002 | Completed final sign-off Nov 2002 | 2581 25th Av | bathroom remodel @ 2nd flr location new swanstone shower enclosure.new tile flr no change to floor pDetails
bathroom remodel @ 2nd flr location new swanstone shower enclosure.new tile flr no change to floor p | $5,000 |
| Mar 5, 2002 | Completed final sign-off May 2002 | 790 09th Av | remodel bathroom, new drywall on ceiling & walls, new tile floorDetails
remodel bathroom, new drywall on ceiling & walls, new tile floor | $4,500 |
| Feb 6, 2002 | Completed final sign-off May 2002 | 29 San Leandro Wy | remodel bathroom, new drywall & tileDetails
remodel bathroom, new drywall & tile | $5,000 |
| May 22, 2001 | Completed final sign-off Jun 2001 | 235 Waller St | bathroom remodel,demo of wall covering(drywall)& fixtures. work in unit#1 only.Details
bathroom remodel,demo of wall covering(drywall)& fixtures. work in unit#1 only. | $7,000 |
| Jan 29, 2001 | Expired or cancelled expired May 2001 | 331 Orizaba Av | bathroom remodel. tear out existing tile & plaster & put up new drywall & tile. non structural workDetails
bathroom remodel. tear out existing tile & plaster & put up new drywall & tile. non structural work | $5,000 |