Back to kitchen remodel contractors
John Jin Hang Wai
- Based in
- San Francisco
- On San Francisco permits
- Jul 2002 to May 2014
- Last 24 months
- 0 permits filed
56 permits since 2000: 50 completed, 6 never finaled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
17 kitchen remodel permits: 15 completed, 2 never finaled. Typically 0 days from filing to permit and 111 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 4, 2014 | Completed final sign-off Jul 2014 | 1200 Clay St | remodel apt # 12 existing 1 bathroom & one kitchenDetails
remodel apt # 12 existing 1 bathroom & one kitchen | $15,000 |
| Jun 21, 2013 | Completed final sign-off Oct 2013 | 2362 20th Av | convert (e) closets into a full bath at rear of (e) bedrooms on 2nd & 3rd floor unit. remodel (e) kitchen on (e) 2nd & 3rd floor.Details
convert (e) closets into a full bath at rear of (e) bedrooms on 2nd & 3rd floor unit. remodel (e) kitchen on (e) 2nd & 3rd floor. | $20,000 |
| Nov 7, 2012 | Never finaled issued Oct 2013, no final | 2359 38th Av | vertical & rear horizontal addition: add 3rd fl w/ 2 bedrms, playrm & full bath. 2nd fl: relocate kitchen, bedrms, add full bath. 1st fl: relocate bedrms, add family rm, exercise rm, guest rm & full bath.Details
vertical & rear horizontal addition: add 3rd fl w/ 2 bedrms, playrm & full bath. 2nd fl: relocate kitchen, bedrms, add full bath. 1st fl: relocate bedrms, add family rm, exercise rm, guest rm & full bath. | $250,000 |
| Apr 19, 2012 | Completed final sign-off Jun 2012 | 311 De Long St | remodel (1) existing kitchen, (1) bathroom downstairs; one bathroom to comply with complaint # 201218201Details
remodel (1) existing kitchen, (1) bathroom downstairs; one bathroom to comply with complaint # 201218201 | $17,500 |
| Jan 21, 2010 | Completed final sign-off Apr 2010 | 425 12th Av | remodel 2nd floor (#425 only): one kitchen ( cabinet, countertop, tile) & one bathroom fixtures., no structural changes, new lighting.Details
remodel 2nd floor (#425 only): one kitchen ( cabinet, countertop, tile) & one bathroom fixtures., no structural changes, new lighting. | $13,500 |
| Jan 11, 2010 | Completed final sign-off May 2010 | 440 Elmira St | convert e kitchen to bedroom, relocate kitchen to e dining area, convert e bath into 2 baths, all on 2nd fl. convert e storage into bedroom, family room, and storage, relocate e full bath at gr floorDetails
convert e kitchen to bedroom, relocate kitchen to e dining area, convert e bath into 2 baths, all on 2nd fl. convert e storage into bedroom, family room, and storage, relocate e full bath at gr floor | $40,000 |
| Nov 17, 2009 | Never finaled issued Nov 2009, no final | 614 Garfield St | remodeling kitchen & bathroom upstairs floor. kitchen min 50% of lighting watt be of h.e. light. bathroom h.e. lights on manual onDetails
remodeling kitchen & bathroom upstairs floor. kitchen min 50% of lighting watt be of h.e. light. bathroom h.e. lights on manual on | $18,000 |
| Jul 8, 2009 | Completed final sign-off Nov 2009 | 423 12th Av | remdel 1 kitchen and 1 bath on upper floorDetails
remdel 1 kitchen and 1 bath on upper floor | $25,000 |
| Oct 21, 2008 | Completed final sign-off Feb 2009 | 1658 30th Av | 1)remodel extg kitchen, bath room and add one new bath room. repair extg stair all work at 2nd floor. 2)construct one bed room. storage room, laundry room and 2 full bath room. all work at ground floor.Details
1)remodel extg kitchen, bath room and add one new bath room. repair extg stair all work at 2nd floor. 2)construct one bed room. storage room, laundry room and 2 full bath room. all work at ground floor. | $75,000 |
| Apr 16, 2008 | Completed final sign-off Jun 2008 | 509 Point Lobos Av | remodeling kitchen & bathroom. replace drywall & floor tiles bathroom. replace the kitchen, countertop, cabinet, floor tile, sink, faucet. lighting to comply with title 24.Details
remodeling kitchen & bathroom. replace drywall & floor tiles bathroom. replace the kitchen, countertop, cabinet, floor tile, sink, faucet. lighting to comply with title 24. | $14,000 |
| Apr 14, 2008 | Completed final sign-off Apr 2008 | 540 43rd Av | increase value of application 200803247807 by $7000.00. remodeling kitchen.Details
increase value of application 200803247807 by $7000.00. remodeling kitchen. | $7,000 |
| Feb 21, 2008 | Completed final sign-off Apr 2008 | 517 03rd Av | remodel existing bathrooms and kitchen at 2nd floor per planDetails
remodel existing bathrooms and kitchen at 2nd floor per plan | $20,000 |
| May 18, 2007 | Completed final sign-off Aug 2007 | 542 43rd Av | remodeling 2nd floor and 3rd floor kitchen and bathroom. (2) kitchen & (2) bath.Details
remodeling 2nd floor and 3rd floor kitchen and bathroom. (2) kitchen & (2) bath. | $18,500 |
| Nov 18, 2005 | Completed final sign-off Jun 2006 | 2232 Divisadero St | remodel kitchen - taking out 2 minor non bearing walls. add kitchen island. replace kitchen cabinets. move the water line, add 2 electrical outlet.Details
remodel kitchen - taking out 2 minor non bearing walls. add kitchen island. replace kitchen cabinets. move the water line, add 2 electrical outlet. | $20,000 |
| Aug 3, 2005 | Completed final sign-off Feb 2006 | 2397 Folsom St | replace kitchen cabinets, sink,floor. no structural. bathroom sink, floor. linoleum.Details
replace kitchen cabinets, sink,floor. no structural. bathroom sink, floor. linoleum. | $8,000 |
| Jun 21, 2005 | Completed final sign-off Nov 2005 | 1445 48th Av | replace the no. 2,3,4 kitchen cabinets (3) bathrooms the tile, repair damaged wall by the stairway aDetails
replace the no. 2,3,4 kitchen cabinets (3) bathrooms the tile, repair damaged wall by the stairway a | $35,000 |
| Mar 31, 2004 | Completed final sign-off Jul 2004 | 1747 Sutter St | remodel kitchen & bathroom. top unit. no structural work.Details
remodel kitchen & bathroom. top unit. no structural work. | $15,000 |