Back to kitchen remodel contractors
John J Sullivan & Company Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Jul 2026
- Last 24 months
- 2 permits filed
51 permits since 2000: 39 completed, 8 never finaled, 4 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old, 4 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 9 completed, 2 never finaled. Typically 0 days from filing to permit and 189 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 22, 2018 | Completed final sign-off Oct 2018 | 2525 Phelps St | new commercial kitchen within (e) medical cannabis manufacturing, processing factory fully sprinkleredDetails
new commercial kitchen within (e) medical cannabis manufacturing, processing factory fully sprinklered | $100,000 |
| May 9, 2012 | Completed final sign-off Oct 2012 | 888 Portola Dr | remodel kitchen in-kind approx. 16 linear feet counter tops.Details
remodel kitchen in-kind approx. 16 linear feet counter tops. | $15,000 |
| Jun 26, 2009 | Completed final sign-off Apr 2010 | 376 20th Av | remodel kitchen on gr floor. mep under separate permit. remove existing wall to extend kitchenDetails
remodel kitchen on gr floor. mep under separate permit. remove existing wall to extend kitchen | $20,000 |
| May 12, 2009 | Completed final sign-off Mar 2010 | 376 20th Av | replace (e) windows aluminum in kind size to new vinyl windows on sides of bldg & rear. no windows in front of bldg. 1st floor: 9 windows & 1 patio door. 2nd floor: 13 windows. 3rd floor: 19 windows. remodel 4 each 10' x 12' kitchen in kind. remodel 8 ea bathrooms. 7' x 8' in kind. note: non of theDetails
replace (e) windows aluminum in kind size to new vinyl windows on sides of bldg & rear. no windows in front of bldg. 1st floor: 9 windows & 1 patio door. 2nd floor: 13 windows. 3rd floor: 19 windows. remodel 4 each 10' x 12' kitchen in kind. remodel 8 ea bathrooms. 7' x 8' in kind. note: non of the | $129,200 |
| Jul 3, 2007 | Completed final sign-off Dec 2007 | 19 Lopez Av | remodel (e) kitchen. remove (e) finishes & appliances & replace w/new. replace windows w/new marvin wood to match. (total 10 windows). replace upstairs b edroom windows w/new marvin window to match (e). not visible from street. lighting: 50% fluorescent.Details
remodel (e) kitchen. remove (e) finishes & appliances & replace w/new. replace windows w/new marvin wood to match. (total 10 windows). replace upstairs b edroom windows w/new marvin window to match (e). not visible from street. lighting: 50% fluorescent. | $25,000 |
| Oct 21, 2005 | Never finaled issued Oct 2005, no final | 1343 Ulloa St | kitchen remodel: remove existing cabinets, appliances, and drywall. replace w/ new fixtures cabinets, finishes all in kind.Details
kitchen remodel: remove existing cabinets, appliances, and drywall. replace w/ new fixtures cabinets, finishes all in kind. | $20,000 |
| Oct 21, 2005 | Never finaled issued Oct 2005, no final | 255 Berry St | kitchen remodel remove existing appliances, cabs, drywall & replace w/new. master bathrm- demo rm to existing studs, replace w/ne wfixtures & finishes. misc & hallway raise int door hts. replace doors. remove & patch & drywall as req'd to complete elec & plumbing workDetails
kitchen remodel remove existing appliances, cabs, drywall & replace w/new. master bathrm- demo rm to existing studs, replace w/ne wfixtures & finishes. misc & hallway raise int door hts. replace doors. remove & patch & drywall as req'd to complete elec & plumbing work | $20,000 |
| Jan 12, 2005 | Completed final sign-off Aug 2005 | 400 Urbano Dr | kitchen remodel, remove exist cabinets, finishes, plaster, fixtures. replace with new. hallwayDetails
kitchen remodel, remove exist cabinets, finishes, plaster, fixtures. replace with new. hallway | $50,000 |
| Jan 15, 2004 | Completed final sign-off Jul 2004 | 115 De Soto St | kitchen remodel-remove & replace exist cabinets,trim,lath&plaster, appliances.Details
kitchen remodel-remove & replace exist cabinets,trim,lath&plaster, appliances. | $20,000 |
| Oct 27, 2003 | Completed final sign-off May 2004 | 92 San Pablo Av | remove extng kitchen cabinets,appliances,plaster & replace w/ new. remove extng bath fixts,tile,&Details
remove extng kitchen cabinets,appliances,plaster & replace w/ new. remove extng bath fixts,tile,& | $55,000 |
| Nov 1, 2001 | Completed final sign-off May 2002 | 128 Stonecrest Dr | remodel 2 (e) bathrms and 1 kitchen no structural workDetails
remodel 2 (e) bathrms and 1 kitchen no structural work | $17,000 |