Back to kitchen remodel contractors
John F Mclaughlin Window & Glass Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2013 to Feb 2014
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 0 days from filing to permit and 15 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2014 | Completed final sign-off Feb 2014 | 1001 Pine St | unit #208: replace existing 1 aluminum window at kitchen/living room with a double glazed aluminum window. sam configuration. u-factor .32, in-kind.Details
unit #208: replace existing 1 aluminum window at kitchen/living room with a double glazed aluminum window. sam configuration. u-factor .32, in-kind. | $1,200 |
| Feb 3, 2014 | Completed final sign-off Feb 2014 | 1001 Pine St | unit 1310: replace 2 existing aluminum windows at kitchen/living room, with a double glazed aluminum window. sam configuration. u-factor .32 - in-kindDetails
unit 1310: replace 2 existing aluminum windows at kitchen/living room, with a double glazed aluminum window. sam configuration. u-factor .32 - in-kind | $2,400 |