Back to kitchen remodel contractors
Jog Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2008 to Jul 2008
- Last 24 months
- 0 permits filed
4 permits since 2000: 2 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 never finaled. Typically 13 days from filing to permit and 197 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 23, 2008 | Never finaled issued May 2008, no final | 45 Lapham Wy | remove existing kitchen cabinets and replace with new like cabinets, remove existing floor tile and replace with new like floor tileDetails
remove existing kitchen cabinets and replace with new like cabinets, remove existing floor tile and replace with new like floor tile | $7,000 |
| May 15, 2008 | Completed final sign-off Dec 2008 | 3179 23rd St | to legal establish new occupancy 6-bed residential care on 1st flr @ unit 1,2,3. comply w/nov #200232113 - re-install kitchens for unit 1 & 2 on 1st flr(middle flr) & replace bathtubs by showers @ unit 2 & 3. re-install entrance door @ unit 2. remove ground flr non-conforming entrance door.Details
to legal establish new occupancy 6-bed residential care on 1st flr @ unit 1,2,3. comply w/nov #200232113 - re-install kitchens for unit 1 & 2 on 1st flr(middle flr) & replace bathtubs by showers @ unit 2 & 3. re-install entrance door @ unit 2. remove ground flr non-conforming entrance door. | $30,000 |