Back to kitchen remodel contractors
Joe Bajuk General Const.
- Based in
- Daly City
- On San Francisco permits
- Sep 2001 to May 2016
- Last 24 months
- 0 permits filed
27 permits since 2000: 20 completed, 2 never finaled, 5 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 never finaled. Typically 0 days from filing to permit and 118 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 2, 2016 | Completed final sign-off Sep 2016 | 714 Castro St | kitchen remodel, remove existing full bath and replace with 1/2 bath & pantry, enlarge opening from kitchen to dining room, enlarge opening from breakfast into tv room.Details
kitchen remodel, remove existing full bath and replace with 1/2 bath & pantry, enlarge opening from kitchen to dining room, enlarge opening from breakfast into tv room. | $96,000 |
| Jun 30, 2014 | Completed final sign-off Jan 2016 | 61 Prosper St | new 300 sq. ft. addition with ground floor laundry 2 story stairwell & second floor exterior deck. add 1 property line window, new roof, master bath remodel, kitchen remodel.Details
new 300 sq. ft. addition with ground floor laundry 2 story stairwell & second floor exterior deck. add 1 property line window, new roof, master bath remodel, kitchen remodel. | $160,000 |
| Mar 18, 2013 | Never finaled issued Mar 2013, no final | 19 Mizpah St | house remodel-kitchen remodel, add stairs & door in rear yard.Details
house remodel-kitchen remodel, add stairs & door in rear yard. | $45,000 |
| Oct 22, 2012 | Completed final sign-off Dec 2012 | 256 States St | upgrade existing kitchen, new cabinets, appliances, new sink & countertop on 2nd floor. no wall relocation. a min. of 50% of the total rated wattage of permanently installed lighting in kitchen shall be high efficacy - cec 150(k)8.Details
upgrade existing kitchen, new cabinets, appliances, new sink & countertop on 2nd floor. no wall relocation. a min. of 50% of the total rated wattage of permanently installed lighting in kitchen shall be high efficacy - cec 150(k)8. | $9,000 |
| Oct 12, 2010 | Completed final sign-off Feb 2011 | 283 Roosevelt Wy | upgrade (e) kitchen- new cabinets, (n) appliances, (n) sink, (n) lights, two windows (replace) & two pocket doors(change from swing door). min. 50% of kitchen lighting wattage shall be of high efficency light.Details
upgrade (e) kitchen- new cabinets, (n) appliances, (n) sink, (n) lights, two windows (replace) & two pocket doors(change from swing door). min. 50% of kitchen lighting wattage shall be of high efficency light. | $24,000 |
| Dec 2, 2004 | Completed final sign-off Jan 2005 | 2267 25th Av | upgrade existing kitchen, new cabinets, new countertop, new appliances, new floor. 2 new windows inDetails
upgrade existing kitchen, new cabinets, new countertop, new appliances, new floor. 2 new windows in | $17,000 |
| Dec 27, 2002 | Completed final sign-off Apr 2003 | 1515 32nd Av | remodel (e) kitchen: new cabinets, new appliances, new counter top, add some electr. outletsDetails
remodel (e) kitchen: new cabinets, new appliances, new counter top, add some electr. outlets | $10,000 |