Jobco
- Based in
- Saratoga
- On San Francisco permits
- Oct 2007 to Jan 2008
- Last 24 months
- 0 permits filed
5 permits since 2000: 1 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 never finaled. Typically 7 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 9, 2008 | Never finaled issued Jan 2008, no final | 2323 47th Av | proposed deck of 490 sq ft. to be constructed on (e) firewalls, w/6 x 6 oressyre treated posts, 2 x 10 pressure treated floor joists, 2/6 trex flooring, 2x6 redwood handrail, 2x2 pickets spaced @3".stairs leading down to back yard concrete patio. all pressure treated wood stained to match flr boardDetails
proposed deck of 490 sq ft. to be constructed on (e) firewalls, w/6 x 6 oressyre treated posts, 2 x 10 pressure treated floor joists, 2/6 trex flooring, 2x6 redwood handrail, 2x2 pickets spaced @3".stairs leading down to back yard concrete patio. all pressure treated wood stained to match flr board | $15,000 |