Back to kitchen remodel contractors
Jm Gonzalez Remodeling
- Based in
- Milpitas
- On San Francisco permits
- Sep 2010 to Sep 2011
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 never finaled. Typically 0 days from filing to permit and 48 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2011 | Never finaled issued Sep 2011, no final | 309 Princeton St | reface 1 kitchen cabinets, new doors an drawers, remove counger top, re-install sink and faucet, repair sheetrock where counter top will be removed,light to comply with cec 150(k) no change to window wall,doors, circuit upgradeDetails
reface 1 kitchen cabinets, new doors an drawers, remove counger top, re-install sink and faucet, repair sheetrock where counter top will be removed,light to comply with cec 150(k) no change to window wall,doors, circuit upgrade | $9,000 |
| Sep 27, 2010 | Completed final sign-off Nov 2010 | 861 Lawton St | replace counter top, reface cabinets, non structural, kitchen remodel, lighting changes to comply with cec 150(k)Details
replace counter top, reface cabinets, non structural, kitchen remodel, lighting changes to comply with cec 150(k) | $30,000 |
| Sep 23, 2010 | Completed final sign-off Nov 2010 | 576 Noe St | remodel kitchen, replace cabinets, counter tops and appliancesDetails
remodel kitchen, replace cabinets, counter tops and appliances | $13,554 |