Back to bathroom remodel contractors
Jkp Mullins Construction
- Based in
- Santa Rosa
- On San Francisco permits
- Apr 2000 to Aug 2017
- Last 24 months
- 0 permits filed
10 permits since 2000: 10 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 2 days from filing to permit and 128 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 15, 2015 | Completed final sign-off Jan 2016 | 1432 Lake St | remodel bath room. increase window size in bathroom. replace stall shower with tub. window not visible from the street facing rear side yard. replace 18x42" window with 36"x42" window with 4x12 header.Details
remodel bath room. increase window size in bathroom. replace stall shower with tub. window not visible from the street facing rear side yard. replace 18x42" window with 36"x42" window with 4x12 header. | $14,000 |
| Jan 31, 2014 | Completed final sign-off Mar 2014 | 245 Santa Paula Av | replace bathtub in upstairs bathroom. retile floor and walls in bathroom.Details
replace bathtub in upstairs bathroom. retile floor and walls in bathroom. | $7,000 |