Jkp Mullins Construction
- Based in
- Santa Rosa
- On San Francisco permits
- Apr 2000 to Aug 2017
- Last 24 months
- 0 permits filed
10 permits since 2000: 10 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 25, 2017 | Completed final sign-off May 2019 | 151 Albion St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $49,500 |
| Jun 15, 2015 | Completed final sign-off Jan 2016 | 1432 Lake St | remodel bath room. increase window size in bathroom. replace stall shower with tub. window not visible from the street facing rear side yard. replace 18x42" window with 36"x42" window with 4x12 header.Details
remodel bath room. increase window size in bathroom. replace stall shower with tub. window not visible from the street facing rear side yard. replace 18x42" window with 36"x42" window with 4x12 header. | $14,000 |
| May 6, 2014 | Completed final sign-off Aug 2014 | 171 Juanita Wy | threads on front stairway and replace iron handrail, work under this permit replace in kind only (less than 50%)Details
threads on front stairway and replace iron handrail, work under this permit replace in kind only (less than 50%) | $7,000 |
| Jan 31, 2014 | Completed final sign-off Mar 2014 | 245 Santa Paula Av | replace bathtub in upstairs bathroom. retile floor and walls in bathroom.Details
replace bathtub in upstairs bathroom. retile floor and walls in bathroom. | $7,000 |
| Mar 5, 2013 | Completed final sign-off Jul 2013 | 1432 Lake St | remove bathrub install stall shower new vanity, exhaust fan, lighting should comply w/ title 24Details
remove bathrub install stall shower new vanity, exhaust fan, lighting should comply w/ title 24 | $17,000 |
| Jan 29, 2013 | Completed final sign-off Dec 2013 | 1734 Greenwich St | install fiberglass replacement windows single hung (approx 80 windows) install vinyl siding of rear side of bldg (not visible from street) like size to lie size for windows u factor - .4 maxDetails
install fiberglass replacement windows single hung (approx 80 windows) install vinyl siding of rear side of bldg (not visible from street) like size to lie size for windows u factor - .4 max | $5,000 |
| Jan 29, 2013 | Completed final sign-off Dec 2013 | 15 Juri St | repair exterior siding on rear of building and cover with vinyl siding (not visible from street)Details
repair exterior siding on rear of building and cover with vinyl siding (not visible from street) | $5,000 |
| Aug 20, 2002 | Completed final sign-off Jan 2003 | 1734 Greenwich St | repair fire damage roof sheathing, door etcDetails
repair fire damage roof sheathing, door etc | $50,000 |
| Apr 17, 2001 | Completed final sign-off Sep 2001 | 1432 Lake St | remove and replace kitchen cabinets and countertopsDetails
remove and replace kitchen cabinets and countertops | $30,000 |
| Apr 10, 2000 | Completed final sign-off Apr 2000 | 1432 Lake St | Details
| $2,500 |