Back to kitchen remodel contractors
Jk Construction
- Based in
- Fremont
- On San Francisco permits
- Sep 2014 to May 2021
- Last 24 months
- 0 permits filed
6 permits since 2000: 4 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 58 days from filing to permit and 34 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2014 | Completed final sign-off Dec 2014 | 179 Delmar St | revision to approved app#201003057685 to remove kitchen at ground floor and make it into a recreation room. to keep the bldg as a single family home with minor interior changes. other minor exterior changes such as changing the styles and size of rear window, andDetails
revision to approved app#201003057685 to remove kitchen at ground floor and make it into a recreation room. to keep the bldg as a single family home with minor interior changes. other minor exterior changes such as changing the styles and size of rear window, and |