Back to kitchen remodel contractors
Jing Hua Construction Corp
- Based in
- South San Francisco
- On San Francisco permits
- Mar 2017 to Feb 2024
- Last 24 months
- 0 permits filed
19 permits since 2000: 17 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 9 completed. Typically 24 days from filing to permit and 314 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 4, 2022 | Completed final sign-off Feb 2023 | 1577 29th Av | construct 2 bedroom, 1 full bath,& family room at g/f. remodel (e) kitchen, bathroom, add 1 full bath, office & replace (e) sheetroc w/ new at 2/f. repair back siding. relocate (e) bathroom & replace (e) sheetrock w/ new at 3/f. install (2) 2'x4' skylight.Details
construct 2 bedroom, 1 full bath,& family room at g/f. remodel (e) kitchen, bathroom, add 1 full bath, office & replace (e) sheetroc w/ new at 2/f. repair back siding. relocate (e) bathroom & replace (e) sheetrock w/ new at 3/f. install (2) 2'x4' skylight. | $168,000 |
| Oct 30, 2020 | Completed final sign-off Dec 2021 | 2462 25th Av | kitchen & bathroom remodel. enclose lightwell per za bulletin #4.Details
kitchen & bathroom remodel. enclose lightwell per za bulletin #4. | $40,000 |
| Aug 15, 2020 | Completed final sign-off May 2023 | 1522 Howard St | application for adu in existing ground floor space. new work to include new kitchen, remodel of existing bathroom, and new doors and window out to rear yard. mep, and any required title 24 calcs, permitted separately. per ord 162-16.Details
application for adu in existing ground floor space. new work to include new kitchen, remodel of existing bathroom, and new doors and window out to rear yard. mep, and any required title 24 calcs, permitted separately. per ord 162-16. | $50,000 |
| Aug 7, 2019 | Completed final sign-off Oct 2022 | 3342 Laguna St | 4th fl, top unit - remodel kitchen, open up 2 walls, remodel 2 baths, add w/d, reconfigure closet; 3rd fl - remodel kitchen, open up 1 wall, remodel 2 baths, add w/d, reconfigure closet; 2nd fl - remodel kitchen, open 1 wall, remodel 2 baths, add w/d, reconfigure closet. add fireplaces, add plywoodDetails
4th fl, top unit - remodel kitchen, open up 2 walls, remodel 2 baths, add w/d, reconfigure closet; 3rd fl - remodel kitchen, open up 1 wall, remodel 2 baths, add w/d, reconfigure closet; 2nd fl - remodel kitchen, open 1 wall, remodel 2 baths, add w/d, reconfigure closet. add fireplaces, add plywood | $320,000 |
| Dec 27, 2018 | Completed final sign-off Sep 2019 | 451 Naples St | 1/f-add 2 (n) bedrms, 1 (n) full bath, (n) home theater w/ bar sink, (n) mud rm. 2/f-remodel (e) bathrm, add (n) half-bath, remodel (e) kitchen. 3/f-convert (e) bedrm to (n) full bath. no new fire walls.Details
1/f-add 2 (n) bedrms, 1 (n) full bath, (n) home theater w/ bar sink, (n) mud rm. 2/f-remodel (e) bathrm, add (n) half-bath, remodel (e) kitchen. 3/f-convert (e) bedrm to (n) full bath. no new fire walls. | $120,000 |
| Jul 2, 2018 | Completed final sign-off Apr 2019 | 106 Foerster St | construct 3 bedrooms, 2 full baths at gr fl, remodel e kitchen, bathroom, add new full bath, rebuild interior stair, 1 skylight 2nd fl, new deck with staircase at rear of bldg siz 18'6x8Details
construct 3 bedrooms, 2 full baths at gr fl, remodel e kitchen, bathroom, add new full bath, rebuild interior stair, 1 skylight 2nd fl, new deck with staircase at rear of bldg siz 18'6x8 | $120,000 |
| Jul 7, 2017 | Completed final sign-off Jan 2018 | 1879 40th Av | kitchen remodel change al lthe cabinets, new floor tile, instal ttl 6 recessed lights in the kitchen ceilings (n) countertop, sink location stay the same add (n) electrical wire for the counter, stove, hood,refrigirator, diswasher.Details
kitchen remodel change al lthe cabinets, new floor tile, instal ttl 6 recessed lights in the kitchen ceilings (n) countertop, sink location stay the same add (n) electrical wire for the counter, stove, hood,refrigirator, diswasher. | $9,000 |
| Jul 7, 2017 | Completed final sign-off Jan 2018 | 2030 17th Av | kitchen remodel, cabinets, floor tile, recessed lights, countertop, sink, new elctrical for counter, appoiances, stove hood.Details
kitchen remodel, cabinets, floor tile, recessed lights, countertop, sink, new elctrical for counter, appoiances, stove hood. | $9,500 |
| Mar 6, 2017 | Completed final sign-off Feb 2018 | 107 Guttenberg St | remodel kitchen & bath, add full bath, relocate stairs, remove walls on 2nd flr. add 3 bedrooms, family, 2 bath on 1st flr. replace w/alum windows @ front & vinyl windows @ rear. relocate water heaters, furnace. upgrade elec, plbg system.Details
remodel kitchen & bath, add full bath, relocate stairs, remove walls on 2nd flr. add 3 bedrooms, family, 2 bath on 1st flr. replace w/alum windows @ front & vinyl windows @ rear. relocate water heaters, furnace. upgrade elec, plbg system. | $98,000 |