Back to kitchen remodel contractors
Jin Construction & Elec
- Based in
- San Francisco
- On San Francisco permits
- Oct 2000 to Apr 2026
- Last 24 months
- 3 permits filed
22 permits since 2000: 11 completed, 1 in progress, 1 never finaled, 9 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 in progress. Typically 60 days from filing to permit and 67 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 24, 2026 | In progress issued Aug 2026 | 1705 Buchanan St | install kitchen equipment in existing restaurant space. interior modifications.Details
install kitchen equipment in existing restaurant space. interior modifications. | $40,000 |
| Mar 9, 2009 | Completed final sign-off May 2009 | 2500 Pacheco St | remove illegally built kitchen at ground floor;, legalize shower at ground floor. relocate entrance door; water heater & furnace; add one hour rated wall for interior connection at ground floor.Details
remove illegally built kitchen at ground floor;, legalize shower at ground floor. relocate entrance door; water heater & furnace; add one hour rated wall for interior connection at ground floor. | $5,000 |