Back to kitchen remodel contractors
Jimmy Vu
- Based in
- San Jose
- On San Francisco permits
- Jan 2019 to Apr 2023
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 never finaled. Typically 7 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 25, 2019 | Never finaled issued Feb 2019, no final | 445 Clipper St | interior remodel, kitchen remodel, closet to convert as a powder room with stack wash and dryer. upgrade electrical meter from 75a to 100a. electrical and lighting works.Details
interior remodel, kitchen remodel, closet to convert as a powder room with stack wash and dryer. upgrade electrical meter from 75a to 100a. electrical and lighting works. | $40,000 |