Back to kitchen remodel contractors
Jim's Design Consulting
- Based in
- Sunnyvale
- On San Francisco permits
- Jun 2018 to Jun 2020
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 121 days from filing to permit and 26 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 30, 2020 | Completed final sign-off Nov 2020 | 550 Market St | 1/f: replace (e) kitchen equipoment for previous pizza restaurant with new equipment for a bakery. mnor plumibng & electircal work included. no work for arch, structural, mech or fire sprinkler system.Details
1/f: replace (e) kitchen equipoment for previous pizza restaurant with new equipment for a bakery. mnor plumibng & electircal work included. no work for arch, structural, mech or fire sprinkler system. | $95,000 |