Back to kitchen remodel contractors
Jiacheng Home Improvements
- Based in
- San Jose
- On San Francisco permits
- Mar 2021 to Aug 2025
- Last 24 months
- 3 permits filed
8 permits since 2000: 4 completed, 4 never finaled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 3 completed, 2 never finaled. Typically 0 days from filing to permit and 218 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2025 | Completed final sign-off May 2026 | 71 Blake St | convert partial e garage to new bdrm, new bath, new family room at 1st fl. remodel e kitchen and e living rm at 2nd fl. add n bath 2nd fl. replace all e windows, add 2 sliding door at 2nd fl bedrm and 1 sliding door 1st fl new rear deck 362.19. relocate washer and dryer,watr heater, furnace 1st fl,Details
convert partial e garage to new bdrm, new bath, new family room at 1st fl. remodel e kitchen and e living rm at 2nd fl. add n bath 2nd fl. replace all e windows, add 2 sliding door at 2nd fl bedrm and 1 sliding door 1st fl new rear deck 362.19. relocate washer and dryer,watr heater, furnace 1st fl, | $80,000 |
| Apr 7, 2025 | Completed final sign-off Nov 2025 | 131 Turquoise Wy | repair damaged beam and floor joist. 1 kitchen and 3 bath remodel. convert 1st fl storage into non-sleeping, media room, 255 sq ft, add 1 full bath. replace furnace and water heater.Details
repair damaged beam and floor joist. 1 kitchen and 3 bath remodel. convert 1st fl storage into non-sleeping, media room, 255 sq ft, add 1 full bath. replace furnace and water heater. | $130,500 |
| Sep 29, 2021 | Completed final sign-off Nov 2021 | 1 Daniel Burnham Ct | unit 409: replace toilet, vanity, wall tiles, floors to new ones. paint whole space include bathroom and kitchen. install new shower door. replace plumbing fixtures with new one. replace cabinets. replace old countertop with new one.Details
unit 409: replace toilet, vanity, wall tiles, floors to new ones. paint whole space include bathroom and kitchen. install new shower door. replace plumbing fixtures with new one. replace cabinets. replace old countertop with new one. | $18,000 |
| Jun 21, 2021 | Never finaled issued Jun 2021, no final | 1371 Waller St | one bathroom floor replace tile. one kitchen cabinet replace top to marble bedroom carpet to replace to spc. non structuralDetails
one bathroom floor replace tile. one kitchen cabinet replace top to marble bedroom carpet to replace to spc. non structural | $14,000 |
| Mar 19, 2021 | Never finaled issued Mar 2021, no final | 955 Cayuga Av | replace floor and redo existing doors in bathroom and kitchen; spc material. door replacement only. no change to opening.Details
replace floor and redo existing doors in bathroom and kitchen; spc material. door replacement only. no change to opening. | $10,000 |